Construction of precast segmental box girder bridge using overhead gantry - a case study
The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2006
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/4586/ http://eprints.utm.my/4586/1/JazlanSallehMFKA2006.pdf |