Dispute resolution in relation to delay of construction project

Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues...

Full description

Bibliographic Details
Main Author: Soon, Tan Kian
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/11232/
http://eprints.utm.my/11232/6/TanKianSoonMFKA2010.pdf
_version_ 1848892295027359744
author Soon, Tan Kian
author_facet Soon, Tan Kian
author_sort Soon, Tan Kian
building UTeM Institutional Repository
collection Online Access
description Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues. Usually, people always look for more economical and time saving method for dispute settlement. But there are still a portion of people choose to settle via litigation proceeding. This problem brought to this study which aims to investigate the origin of disputes settlement via litigation proceeding that contributed by delay in project undertaking. The objectives of the study include the analysis of taxonomy of delay and review of the available dispute resolution techniques. Analysis on the trend of delay dispute resolution by litigation in the selected cases is made. Third objective was set where the outline for dispute avoidance is formulated. This study is restricted to the cases within Malaysia. Analysis shows that the main causes of the delay are the mostly defaulted by the proprietor; the executors were showed as the majority party in filing the court suit among which they obtained high percentage in winning the award. The study shows that delay dispute settlement via litigation proceeding generally occurred when the financial conflict between parties take place. In order to avoid the settlement of dispute via litigation, measures of dispute avoidance are proposed. The findings are expected to be useful as further references for parties in facilitate the execution of their construction work.
first_indexed 2025-11-15T21:11:35Z
format Thesis
id utm-11232
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T21:11:35Z
publishDate 2010
recordtype eprints
repository_type Digital Repository
spelling utm-112322017-09-26T01:31:00Z http://eprints.utm.my/11232/ Dispute resolution in relation to delay of construction project Soon, Tan Kian HD28 Management. Industrial Management TH Building construction Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues. Usually, people always look for more economical and time saving method for dispute settlement. But there are still a portion of people choose to settle via litigation proceeding. This problem brought to this study which aims to investigate the origin of disputes settlement via litigation proceeding that contributed by delay in project undertaking. The objectives of the study include the analysis of taxonomy of delay and review of the available dispute resolution techniques. Analysis on the trend of delay dispute resolution by litigation in the selected cases is made. Third objective was set where the outline for dispute avoidance is formulated. This study is restricted to the cases within Malaysia. Analysis shows that the main causes of the delay are the mostly defaulted by the proprietor; the executors were showed as the majority party in filing the court suit among which they obtained high percentage in winning the award. The study shows that delay dispute settlement via litigation proceeding generally occurred when the financial conflict between parties take place. In order to avoid the settlement of dispute via litigation, measures of dispute avoidance are proposed. The findings are expected to be useful as further references for parties in facilitate the execution of their construction work. 2010-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/11232/6/TanKianSoonMFKA2010.pdf Soon, Tan Kian (2010) Dispute resolution in relation to delay of construction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle HD28 Management. Industrial Management
TH Building construction
Soon, Tan Kian
Dispute resolution in relation to delay of construction project
title Dispute resolution in relation to delay of construction project
title_full Dispute resolution in relation to delay of construction project
title_fullStr Dispute resolution in relation to delay of construction project
title_full_unstemmed Dispute resolution in relation to delay of construction project
title_short Dispute resolution in relation to delay of construction project
title_sort dispute resolution in relation to delay of construction project
topic HD28 Management. Industrial Management
TH Building construction
url http://eprints.utm.my/11232/
http://eprints.utm.my/11232/6/TanKianSoonMFKA2010.pdf