Factors affecting the contractor’s mark-up size decision in Malaysia

Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level....

Full description

Bibliographic Details
Main Author: Tey, Kim Hai
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/11137/
http://eprints.utm.my/11137/1/TeyKimHaiMFKA2009.pdf
_version_ 1848892269545914368
author Tey, Kim Hai
author_facet Tey, Kim Hai
author_sort Tey, Kim Hai
building UTeM Institutional Repository
collection Online Access
description Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level. Hence possessing a sound knowledge of the factors affecting the contractors’ mark-up size decision is imperative in identifying the “right” mark-up size in bidding. Thus, this project is to investigate the factors affecting the mark-up size decision. It seeks to determine the factors affecting the mark-up size decision and analyzes the perceived importance of various factors in different contractor size’s evaluation. The project extent investigates on the current practices in contractors’ mark-up size decision. Questionnaire conducted and distributed to the respondents who are the medium and large-size of contractors in Johor Bahru, Malaysia. This finding of project shows that there are top ten important factors affecting mark-up size decision such as overall economy, competition, need for work, size of project, project cash flow, and so on. Besides, the ranking of most influence category of factor were followed by project characteristics, company characteristics, economic situation, project documentation and bidding situation. Finding also indicates that the different of perceived important of factors between medium and large-size contractors’ evaluation. Seven factors which are degree of difficulty, uncertainly in cost estimate, need for work, availability of qualified staff, time allowed submitting bids, bidding document price and risk involved in investment has been highlighted. The finding shows that the most preference mark-up size is 10 % to 15%. Experience, previous record and market survey are commonly practiced by contractors in determining their mark-up size. Unfortunately, the bidding models were not utilized by contractors since they are not sufficient information to effectively use it and the complexity of these models.
first_indexed 2025-11-15T21:11:11Z
format Thesis
id utm-11137
institution Universiti Teknologi Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T21:11:11Z
publishDate 2009
recordtype eprints
repository_type Digital Repository
spelling utm-111372018-06-25T01:31:05Z http://eprints.utm.my/11137/ Factors affecting the contractor’s mark-up size decision in Malaysia Tey, Kim Hai TA Engineering (General). Civil engineering (General) Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level. Hence possessing a sound knowledge of the factors affecting the contractors’ mark-up size decision is imperative in identifying the “right” mark-up size in bidding. Thus, this project is to investigate the factors affecting the mark-up size decision. It seeks to determine the factors affecting the mark-up size decision and analyzes the perceived importance of various factors in different contractor size’s evaluation. The project extent investigates on the current practices in contractors’ mark-up size decision. Questionnaire conducted and distributed to the respondents who are the medium and large-size of contractors in Johor Bahru, Malaysia. This finding of project shows that there are top ten important factors affecting mark-up size decision such as overall economy, competition, need for work, size of project, project cash flow, and so on. Besides, the ranking of most influence category of factor were followed by project characteristics, company characteristics, economic situation, project documentation and bidding situation. Finding also indicates that the different of perceived important of factors between medium and large-size contractors’ evaluation. Seven factors which are degree of difficulty, uncertainly in cost estimate, need for work, availability of qualified staff, time allowed submitting bids, bidding document price and risk involved in investment has been highlighted. The finding shows that the most preference mark-up size is 10 % to 15%. Experience, previous record and market survey are commonly practiced by contractors in determining their mark-up size. Unfortunately, the bidding models were not utilized by contractors since they are not sufficient information to effectively use it and the complexity of these models. 2009-06 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/11137/1/TeyKimHaiMFKA2009.pdf Tey, Kim Hai (2009) Factors affecting the contractor’s mark-up size decision in Malaysia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Tey, Kim Hai
Factors affecting the contractor’s mark-up size decision in Malaysia
title Factors affecting the contractor’s mark-up size decision in Malaysia
title_full Factors affecting the contractor’s mark-up size decision in Malaysia
title_fullStr Factors affecting the contractor’s mark-up size decision in Malaysia
title_full_unstemmed Factors affecting the contractor’s mark-up size decision in Malaysia
title_short Factors affecting the contractor’s mark-up size decision in Malaysia
title_sort factors affecting the contractor’s mark-up size decision in malaysia
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/11137/
http://eprints.utm.my/11137/1/TeyKimHaiMFKA2009.pdf