Factors affecting the contractor’s mark-up size decision in Malaysia
Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level....
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://eprints.utm.my/11137/ http://eprints.utm.my/11137/1/TeyKimHaiMFKA2009.pdf |