Bottleneck-based heuristic for permutation flowshop scheduling
The newly heuristic is developed by introducing the bottleneck-based concept that was applied at the beginning of initial solution determination. The heuristic is known as Bottleneck-Based (BNB) heuristic. The previous study found that the scheduling activity become complex when dealing with large n...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English English English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/837/ http://eprints.uthm.edu.my/837/1/24p%20NOOR%20AMIRA%20ISA.pdf http://eprints.uthm.edu.my/837/2/NOOR%20AMIRA%20ISA%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/837/3/NOOR%20AMIRA%20ISA%20WATERMARK.pdf |