Evaluation of uncertainties on generation expansion planning
In the deregulated power market the generator firms compete with each other to reach the maximum profit. And in this type of power market the investors encounter several uncertain parameters. Demand uncertainty is one of the main parameters can reduce the risk of investing when the planners consider...
| Main Authors: | , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English |
| Published: |
IEEE
2013
|
| Online Access: | http://psasir.upm.edu.my/id/eprint/68833/ http://psasir.upm.edu.my/id/eprint/68833/1/Evaluation%20of%20uncertainties%20on%20generation%20expansion%20planning.pdf |
| _version_ | 1848856238359576576 |
|---|---|
| author | Esfahani, Mohammad Tolou Askari Sedehi Ab Kadir, Mohd Zainal Abidin Hizam, Hashim Jasni, Jasronita |
| author_facet | Esfahani, Mohammad Tolou Askari Sedehi Ab Kadir, Mohd Zainal Abidin Hizam, Hashim Jasni, Jasronita |
| author_sort | Esfahani, Mohammad Tolou Askari Sedehi |
| building | UPM Institutional Repository |
| collection | Online Access |
| description | In the deregulated power market the generator firms compete with each other to reach the maximum profit. And in this type of power market the investors encounter several uncertain parameters. Demand uncertainty is one of the main parameters can reduce the risk of investing when the planners consider in their planning. Stochastic programming has been represented in this article to solve the investment problem. This article proposed a model by considering the demand uncertainties. And also, other parameters including the financial restriction, forced outage rate (FOR), penalty for unserved demand has been considered. The variable decisions in this model include the total benefit of investor, expansion capacity at the beginning of each period, operation level for each generator. Sensitivity analysis for FOR and the penalty for unserved demand on the expansion planning confirm this model. Finally, the proposed framework has been implemented on the case study to approve this model. |
| first_indexed | 2025-11-15T11:38:29Z |
| format | Conference or Workshop Item |
| id | upm-68833 |
| institution | Universiti Putra Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T11:38:29Z |
| publishDate | 2013 |
| publisher | IEEE |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | upm-688332019-06-10T03:48:29Z http://psasir.upm.edu.my/id/eprint/68833/ Evaluation of uncertainties on generation expansion planning Esfahani, Mohammad Tolou Askari Sedehi Ab Kadir, Mohd Zainal Abidin Hizam, Hashim Jasni, Jasronita In the deregulated power market the generator firms compete with each other to reach the maximum profit. And in this type of power market the investors encounter several uncertain parameters. Demand uncertainty is one of the main parameters can reduce the risk of investing when the planners consider in their planning. Stochastic programming has been represented in this article to solve the investment problem. This article proposed a model by considering the demand uncertainties. And also, other parameters including the financial restriction, forced outage rate (FOR), penalty for unserved demand has been considered. The variable decisions in this model include the total benefit of investor, expansion capacity at the beginning of each period, operation level for each generator. Sensitivity analysis for FOR and the penalty for unserved demand on the expansion planning confirm this model. Finally, the proposed framework has been implemented on the case study to approve this model. IEEE 2013 Conference or Workshop Item PeerReviewed text en http://psasir.upm.edu.my/id/eprint/68833/1/Evaluation%20of%20uncertainties%20on%20generation%20expansion%20planning.pdf Esfahani, Mohammad Tolou Askari Sedehi and Ab Kadir, Mohd Zainal Abidin and Hizam, Hashim and Jasni, Jasronita (2013) Evaluation of uncertainties on generation expansion planning. In: 2013 IEEE 7th International Power Engineering and Optimization Conference (PEOCO 2013), 3-4 June 2013, Langkawi, Kedah. (pp. 273-276). 10.1109/PEOCO.2013.6564556 |
| spellingShingle | Esfahani, Mohammad Tolou Askari Sedehi Ab Kadir, Mohd Zainal Abidin Hizam, Hashim Jasni, Jasronita Evaluation of uncertainties on generation expansion planning |
| title | Evaluation of uncertainties on generation expansion planning |
| title_full | Evaluation of uncertainties on generation expansion planning |
| title_fullStr | Evaluation of uncertainties on generation expansion planning |
| title_full_unstemmed | Evaluation of uncertainties on generation expansion planning |
| title_short | Evaluation of uncertainties on generation expansion planning |
| title_sort | evaluation of uncertainties on generation expansion planning |
| url | http://psasir.upm.edu.my/id/eprint/68833/ http://psasir.upm.edu.my/id/eprint/68833/ http://psasir.upm.edu.my/id/eprint/68833/1/Evaluation%20of%20uncertainties%20on%20generation%20expansion%20planning.pdf |