Building cost comparison between conventional and formwork system

The Malaysian construction industry is undergoing a transitional change from an industry employing conventional technology to a more systematic and mechanised system. This new system is now known as the industrialised building system (IBS). This new method of construction can increase productivity a...

Full description

Bibliographic Details
Main Authors: Haron, Nuzul Azam, Hassim, Salihudin, Abdul Kadir, Mohd Razali, Jaafar, Mohd Saleh
Format: Article
Language:English
Published: Penerbit UTM Press 2005
Online Access:http://psasir.upm.edu.my/id/eprint/23129/
http://psasir.upm.edu.my/id/eprint/23129/1/23129.pdf
_version_ 1848844671419154432
author Haron, Nuzul Azam
Hassim, Salihudin
Abdul Kadir, Mohd Razali
Jaafar, Mohd Saleh
author_facet Haron, Nuzul Azam
Hassim, Salihudin
Abdul Kadir, Mohd Razali
Jaafar, Mohd Saleh
author_sort Haron, Nuzul Azam
building UPM Institutional Repository
collection Online Access
description The Malaysian construction industry is undergoing a transitional change from an industry employing conventional technology to a more systematic and mechanised system. This new system is now known as the industrialised building system (IBS). This new method of construction can increase productivity and quality of work through the use of better construction machinery, equipment, materials, and extensive pre–project planning. This study is essential since there is no organised body, which can provide the necessary information on the building cost comparison between the conventional system and industrialised building system in Malaysia’s construction industry. The study also addresses the building cost comparison of the conventional system and selected formwork system in the industrialised building system. It details out the building cost comparison between the conventional system and the formwork system and indicates which of the two is cheaper. The data were collected through questionnaire survey and case study, which involved institutional buildings. Through the statistical test ‘t–test’, it is shown that there is a significant difference in cost saving for the conventional system as compared to the formwork system.
first_indexed 2025-11-15T08:34:38Z
format Article
id upm-23129
institution Universiti Putra Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T08:34:38Z
publishDate 2005
publisher Penerbit UTM Press
recordtype eprints
repository_type Digital Repository
spelling upm-231292015-12-07T04:19:24Z http://psasir.upm.edu.my/id/eprint/23129/ Building cost comparison between conventional and formwork system Haron, Nuzul Azam Hassim, Salihudin Abdul Kadir, Mohd Razali Jaafar, Mohd Saleh The Malaysian construction industry is undergoing a transitional change from an industry employing conventional technology to a more systematic and mechanised system. This new system is now known as the industrialised building system (IBS). This new method of construction can increase productivity and quality of work through the use of better construction machinery, equipment, materials, and extensive pre–project planning. This study is essential since there is no organised body, which can provide the necessary information on the building cost comparison between the conventional system and industrialised building system in Malaysia’s construction industry. The study also addresses the building cost comparison of the conventional system and selected formwork system in the industrialised building system. It details out the building cost comparison between the conventional system and the formwork system and indicates which of the two is cheaper. The data were collected through questionnaire survey and case study, which involved institutional buildings. Through the statistical test ‘t–test’, it is shown that there is a significant difference in cost saving for the conventional system as compared to the formwork system. Penerbit UTM Press 2005-12 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/23129/1/23129.pdf Haron, Nuzul Azam and Hassim, Salihudin and Abdul Kadir, Mohd Razali and Jaafar, Mohd Saleh (2005) Building cost comparison between conventional and formwork system. Jurnal Teknologi, 43 (B). pp. 1-11. ISSN 0127–9696; ESSN: 2180–3722 http://www.jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/762
spellingShingle Haron, Nuzul Azam
Hassim, Salihudin
Abdul Kadir, Mohd Razali
Jaafar, Mohd Saleh
Building cost comparison between conventional and formwork system
title Building cost comparison between conventional and formwork system
title_full Building cost comparison between conventional and formwork system
title_fullStr Building cost comparison between conventional and formwork system
title_full_unstemmed Building cost comparison between conventional and formwork system
title_short Building cost comparison between conventional and formwork system
title_sort building cost comparison between conventional and formwork system
url http://psasir.upm.edu.my/id/eprint/23129/
http://psasir.upm.edu.my/id/eprint/23129/
http://psasir.upm.edu.my/id/eprint/23129/1/23129.pdf