Project analysis on two low cost housing schemes in Sarawak (Modular method vs conventional method)
This research paper evaluates the project management system of two low cost housing scheme in Sarawak, using different construction method.
| Main Author: | |
|---|---|
| Format: | Final Year Project Report / IMRAD |
| Language: | English |
| Published: |
University Malaysia Sarawak, UNIMAS.
2000
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/2904/ http://ir.unimas.my/id/eprint/2904/8/Hadiatul%20Aida.pdf |