Analysis of gauge glass failure possibility for boiler

The heating process in the boiler is an operation that carried in 24 hours a day. The boiler operates under high temperature and pressure. There is always a possibility for the fitting of the boiler to have failure. The purpose of this study is to find the failure possibility of the gauge glass thr...

Full description

Bibliographic Details
Main Author: Nur Farida, Ismail
Format: Undergraduates Project Papers
Language:English
Published: 2007
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2332/
http://umpir.ump.edu.my/id/eprint/2332/1/01.Analysis%20of%20gauge%20glass%20failure%20possibility%20for%20boiler.PDF
_version_ 1848817030343426048
author Nur Farida, Ismail
author_facet Nur Farida, Ismail
author_sort Nur Farida, Ismail
building UMP Institutional Repository
collection Online Access
description The heating process in the boiler is an operation that carried in 24 hours a day. The boiler operates under high temperature and pressure. There is always a possibility for the fitting of the boiler to have failure. The purpose of this study is to find the failure possibility of the gauge glass through literature and simulation. The gauge glass will fail due to stress, temperature and fittings problem. This analysis is concentrate on the glass as the glass is brittle and have higher tendency to fail rather than other fittings and connector. As the failure due to stress and temperature is unavoidable, the inspection must be done periodically. During the inspection, overall boiler must be checked to make sure there is no faultiness to the part that attached to the boiler especially gauge glass. If the is a problem occur during inspection, this gauge glass have to be repair or replace.
first_indexed 2025-11-15T01:15:17Z
format Undergraduates Project Papers
id ump-2332
institution Universiti Malaysia Pahang
institution_category Local University
language English
last_indexed 2025-11-15T01:15:17Z
publishDate 2007
recordtype eprints
repository_type Digital Repository
spelling ump-23322023-04-05T02:18:41Z http://umpir.ump.edu.my/id/eprint/2332/ Analysis of gauge glass failure possibility for boiler Nur Farida, Ismail TJ Mechanical engineering and machinery The heating process in the boiler is an operation that carried in 24 hours a day. The boiler operates under high temperature and pressure. There is always a possibility for the fitting of the boiler to have failure. The purpose of this study is to find the failure possibility of the gauge glass through literature and simulation. The gauge glass will fail due to stress, temperature and fittings problem. This analysis is concentrate on the glass as the glass is brittle and have higher tendency to fail rather than other fittings and connector. As the failure due to stress and temperature is unavoidable, the inspection must be done periodically. During the inspection, overall boiler must be checked to make sure there is no faultiness to the part that attached to the boiler especially gauge glass. If the is a problem occur during inspection, this gauge glass have to be repair or replace. 2007-11 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/2332/1/01.Analysis%20of%20gauge%20glass%20failure%20possibility%20for%20boiler.PDF Nur Farida, Ismail (2007) Analysis of gauge glass failure possibility for boiler. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.
spellingShingle TJ Mechanical engineering and machinery
Nur Farida, Ismail
Analysis of gauge glass failure possibility for boiler
title Analysis of gauge glass failure possibility for boiler
title_full Analysis of gauge glass failure possibility for boiler
title_fullStr Analysis of gauge glass failure possibility for boiler
title_full_unstemmed Analysis of gauge glass failure possibility for boiler
title_short Analysis of gauge glass failure possibility for boiler
title_sort analysis of gauge glass failure possibility for boiler
topic TJ Mechanical engineering and machinery
url http://umpir.ump.edu.my/id/eprint/2332/
http://umpir.ump.edu.my/id/eprint/2332/1/01.Analysis%20of%20gauge%20glass%20failure%20possibility%20for%20boiler.PDF