Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic an...
Similar Items
Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
by: Muhammad , Ali
Published: (2013)
by: Muhammad , Ali
Published: (2013)
Effect of traffic volume and shoulder width towards crash cases at jalan Kuantan bypass
by: Norazlina, Ahmad Tajuddin
Published: (2018)
by: Norazlina, Ahmad Tajuddin
Published: (2018)
Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
by: Nur Syazana, Jusoh
Published: (2018)
by: Nur Syazana, Jusoh
Published: (2018)
Supply Chain Management in Flyover Projects in India
by: Yadav, Sudhir, et al.
Published: (2015)
by: Yadav, Sudhir, et al.
Published: (2015)
Prediction of grey water footprint of Sungai Lembing, Bukit Sagu and Bukit Ubi water treatment plants
by: Siti Fazlina, Mohd Suhaimi
Published: (2019)
by: Siti Fazlina, Mohd Suhaimi
Published: (2019)
Determination and prediction of blue water footprint at Sungai Lembing, Bukit Sagu and Bukit Ubi water treatment plant
by: Siti Ainifatihah, Noor Hazlim
Published: (2019)
by: Siti Ainifatihah, Noor Hazlim
Published: (2019)
Geotechnical properties of bauxite: A case study in Bukit Goh, Kuantan, Malaysia
by: Muzamir, Hasan, et al.
Published: (2021)
by: Muzamir, Hasan, et al.
Published: (2021)
Modelling of rainfall-runoff relationship for Bukit Kenau station in Kuantan River Basin
by: Nur Miza, Mohamad
Published: (2016)
by: Nur Miza, Mohamad
Published: (2016)
Properties of Raw and Processed Bukit Goh Bauxite In Kuantan, Pahang In Accordance With IMSBC Code
by: Muzamir, Hasan, et al.
Published: (2017)
by: Muzamir, Hasan, et al.
Published: (2017)
Impact of minerals freight and logistic operations towards Kuantan traffic flow
by: Intan Suhana, Mohd Razelan, et al.
Published: (2019)
by: Intan Suhana, Mohd Razelan, et al.
Published: (2019)
Effect of implementing one way traffic in Kuantan city
by: Vun, Hon Yuan
Published: (2016)
by: Vun, Hon Yuan
Published: (2016)
Improving safety performance in constructions project in Malaysia ( case study : in Kuantan )
by: Iradatul Hanis, Abd Hamid
Published: (2017)
by: Iradatul Hanis, Abd Hamid
Published: (2017)
No word yet on 5 proposed flyovers, says manyin
by: The Borneo Post
Published: (2016)
by: The Borneo Post
Published: (2016)
Properties and liquefaction risk on bulk cargo carrying Bukit Goh, Kuantan bauxite accordance to IMSBC code
by: Masitah, Abdullah
Published: (2018)
by: Masitah, Abdullah
Published: (2018)
Geotechnical Properties Of Raw And Processed Bauxite From Bukit Goh, Kuantan, Pahang; In Accordance With IMSBC Code
by: Muzamir, Hasan, et al.
Published: (2018)
by: Muzamir, Hasan, et al.
Published: (2018)
Properties and liquefaction risk on bulk cargo carrying Bukit Goh, Kuantan bauxite; in accordance with IMSBC Code
by: Muzamir, Hasan, et al.
Published: (2019)
by: Muzamir, Hasan, et al.
Published: (2019)
Sustainability study of u-turn at km16 – km 18, Jalan Kuantan - Gambang
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
by: Nor Azliayana, Ahmad Nordin
Published: (2017)
Study on current practice of construction waste management system in Gambang, Kuantan, Pahang
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
by: Nur Fatin Aqilah, Mat Zin
Published: (2016)
Investigation on the use of fly ash as additive in optimizing cost of road pavement structure, case study at Jalan Sultan Abu Bakar, Indera Mahkota, Kuantan
by: Muhammad Hafeez, Hashim
Published: (2010)
by: Muhammad Hafeez, Hashim
Published: (2010)
The maintenance management of marine port facilities : case study Kuantan marine port
by: Muhammad Zulhilmi, Nordin
Published: (2010)
by: Muhammad Zulhilmi, Nordin
Published: (2010)
Alat pencungkil ubi kayu
by: Kassim, Noraniah, et al.
Published: (2020)
by: Kassim, Noraniah, et al.
Published: (2020)
Mesin pengupas kulit ubi kayu
by: Shaharin, Nurul Fatin Najwa, et al.
Published: (2020)
by: Shaharin, Nurul Fatin Najwa, et al.
Published: (2020)
Auto cruise system: A system to assist during traffic congestion
by: Yunahar, Taufik, et al.
Published: (2011)
by: Yunahar, Taufik, et al.
Published: (2011)
The impacts of neighbourhood traffic management
by: David Daniel, Basil
Published: (2012)
by: David Daniel, Basil
Published: (2012)
Case study of safety management in construction industry
by: Nur Mashita, Ahmad
Published: (2019)
by: Nur Mashita, Ahmad
Published: (2019)
Re-Thinking & Improvise Uses Of
Negative Space Under The Flyover:
Parking Spaces
by: Husnil, Muhammad Asraf
Published: (2019)
by: Husnil, Muhammad Asraf
Published: (2019)
Analysis of construction and demolition waste generation at Kuantan, Pahang
by: Advein, Ami
Published: (2017)
by: Advein, Ami
Published: (2017)
Relationship between roadside features and road traffic accidents along KM 3 - KM 27 of Jalan Kuantan-Gambang
by: Marzida, Abdul Manaf
Published: (2010)
by: Marzida, Abdul Manaf
Published: (2010)
Case study : energy dissipater constructed in Kuantan
by: Nurbaitee, Mohamad Fauzi
Published: (2012)
by: Nurbaitee, Mohamad Fauzi
Published: (2012)
Basic and morphological properties of Bukit Goh bauxite
by: Muzamir, Hasan, et al.
Published: (2018)
by: Muzamir, Hasan, et al.
Published: (2018)
A case study on quality management system in construction project
by: Abdullah @ Mohd. Asmoni, Mat Naim
Published: (2005)
by: Abdullah @ Mohd. Asmoni, Mat Naim
Published: (2005)
Kajian Keberkesanan Bonggol Jalan Dan Bar Melintang (Transverse Bar) Di Jalan Persiaran Gurney, Jalan Sempadan Dan Jalan Persiaran Pekaka
by: Jamaludin, Mohd Muzamil
Published: (2006)
by: Jamaludin, Mohd Muzamil
Published: (2006)
An autonomous integrated architecture for the next generation air traffic management and Avionics systems
by: Ahmed, Mirghani Ishak, et al.
Published: (2011)
by: Ahmed, Mirghani Ishak, et al.
Published: (2011)
Managing construction project risks; case study: contractors in Johor Bahru
by: Abdul Rahiman, Nafisah
Published: (2006)
by: Abdul Rahiman, Nafisah
Published: (2006)
Tips tanam ubi keladi
by: Utusan Malaysia, Abdull Ghaffar Othman
Published: (2012)
by: Utusan Malaysia, Abdull Ghaffar Othman
Published: (2012)
Tips tanam ubi keledek
by: Utusan Malaysia, Abdull Ghaffar Othman
Published: (2012)
by: Utusan Malaysia, Abdull Ghaffar Othman
Published: (2012)
Petua tanam ubi kayu
by: Othman, Abdul Ghaffar
Published: (2012)
by: Othman, Abdul Ghaffar
Published: (2012)
Optimizing Urban Mobility in Hangzhou: A Case Study of the City Brain’s AI-Driven Traffic Management
by: Guo, Hanxiang, et al.
Published: (2025)
by: Guo, Hanxiang, et al.
Published: (2025)
Housing defects in Kuantan : a case study on buyers’ satisfaction of housing projects
by: Mohd Firdaus, Osmom
Published: (2017)
by: Mohd Firdaus, Osmom
Published: (2017)
Traffic noise prediction in bandar mahkota cheras using calculation of road traffic noise (CORTN)
by: Gan, Yuyun
Published: (2023)
by: Gan, Yuyun
Published: (2023)
Similar Items
-
Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
by: Muhammad , Ali
Published: (2013) -
Effect of traffic volume and shoulder width towards crash cases at jalan Kuantan bypass
by: Norazlina, Ahmad Tajuddin
Published: (2018) -
Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
by: Nur Syazana, Jusoh
Published: (2018) -
Supply Chain Management in Flyover Projects in India
by: Yadav, Sudhir, et al.
Published: (2015) -
Prediction of grey water footprint of Sungai Lembing, Bukit Sagu and Bukit Ubi water treatment plants
by: Siti Fazlina, Mohd Suhaimi
Published: (2019)