Skip to content
VuFind
Advanced
  • Traffic management during cons...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
QR Code

Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan

Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic an...

Full description

Bibliographic Details
Main Author: Sharmaine, Shaari
Format: Undergraduates Project Papers
Language:English
English
English
English
Published: 2017
Subjects:
TA Engineering (General). Civil engineering (General)
Online Access:http://umpir.ump.edu.my/id/eprint/20961/
http://umpir.ump.edu.my/id/eprint/20961/1/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/20961/7/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Abstract.pdf
http://umpir.ump.edu.my/id/eprint/20961/13/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/20961/19/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-References.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://umpir.ump.edu.my/id/eprint/20961/
http://umpir.ump.edu.my/id/eprint/20961/1/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/20961/7/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Abstract.pdf
http://umpir.ump.edu.my/id/eprint/20961/13/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/20961/19/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-References.pdf

Similar Items

  • Case study: congestion at traffic signal of junction Jalan Bukit Ubi and Jalan Dato Lim Hoe Lek
    by: Muhammad , Ali
    Published: (2013)
  • Effect of traffic volume and shoulder width towards crash cases at jalan Kuantan bypass
    by: Norazlina, Ahmad Tajuddin
    Published: (2018)
  • Assesment of construction planning : maintenance of piping system at Bukit Sekilau Kuantan case study
    by: Nur Syazana, Jusoh
    Published: (2018)
  • Supply Chain Management in Flyover Projects in India
    by: Yadav, Sudhir, et al.
    Published: (2015)
  • Prediction of grey water footprint of Sungai Lembing, Bukit Sagu and Bukit Ubi water treatment plants
    by: Siti Fazlina, Mohd Suhaimi
    Published: (2019)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips