_version_ 1848821239904206848
author Sharmaine, Shaari
author_facet Sharmaine, Shaari
author_sort Sharmaine, Shaari
building UMP Institutional Repository
collection Online Access
description Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study.
first_indexed 2025-11-15T02:22:12Z
format Undergraduates Project Papers
id ump-20961
institution Universiti Malaysia Pahang
institution_category Local University
language English
English
English
English
last_indexed 2025-11-15T02:22:12Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling ump-209612021-05-27T07:40:08Z http://umpir.ump.edu.my/id/eprint/20961/ Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan Sharmaine, Shaari TA Engineering (General). Civil engineering (General) Managing traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study. 2017-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/20961/1/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Table%20of%20contents.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/20961/7/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Abstract.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/20961/13/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Chapter%201.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/20961/19/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-References.pdf Sharmaine, Shaari (2017) Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
spellingShingle TA Engineering (General). Civil engineering (General)
Sharmaine, Shaari
Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title_full Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title_fullStr Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title_full_unstemmed Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title_short Traffic management during construction: case study of flyover at Jalan Bukit Ubi, Kuantan
title_sort traffic management during construction: case study of flyover at jalan bukit ubi, kuantan
topic TA Engineering (General). Civil engineering (General)
url http://umpir.ump.edu.my/id/eprint/20961/
http://umpir.ump.edu.my/id/eprint/20961/1/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/20961/7/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Abstract.pdf
http://umpir.ump.edu.my/id/eprint/20961/13/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/20961/19/Traffic%20management%20during%20construction%20-%20case%20study%20of%20flyover%20at%20Jalan%20Bukit%20Ubi%2C%20Kuantan-References.pdf