Factors affecting time performance of refurbishment projects in Singapore / Chew Lee Fuan
Refurbishment is becoming an important economic driver in Singapore’s construction industry due to existence of high number of ageing buildings, limited vacant land for new development and the rapid changes of technology used. There are limitations and even drawbacks to these efforts as the time...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://pendeta.um.edu.my/client/default/search/results?qu=Factors+affecting+time+performance+of+refurbishment+projects+in+Singapore&te= http://studentsrepo.um.edu.my/3591/13/TITLE_PAGE%252C_ABSTRACT%252C_CONTENT.pdf http://studentsrepo.um.edu.my/3591/5/FULL_CHAPTERS.pdf http://studentsrepo.um.edu.my/3591/6/REFERENCES_%26_APPENDICES.pdf |
| Summary: | Refurbishment is becoming an important economic driver in Singapore’s construction
industry due to existence of high number of ageing buildings, limited vacant land for
new development and the rapid changes of technology used. There are limitations and
even drawbacks to these efforts as the time required to complete the refurbishment
projects is frequently greater than the time originally specified in the contract. The main
purpose of the study is to identify factors affecting the time performance for
refurbishment projects in Singapore.
This study used mixed method approach with quantitative as the main data. Semistructured
interviews that involved twenty projects were carried out to verify the project
characteristics of refurbishment in Singapore. The result of the interviews was used to
identify the project characteristics variables for the next stage of data collection. Onehundred
(100) questionnaires were distributed to main contractors who have experience
in refurbishment and a contract value of minimum two-hundred-and-fifty thousand
dollars. Of those, 33 replied and were found to be useful for data analysis.
Statistical Package for the Social Sciences (SPSS) was used to analyse the data. From
the data analysis, three variables were found to be significantly correlated with time
performance variable. They are non-payment of salary to workers causing slow down;
conflict and disputes between contractor and superintending officer; and uncertainty and
complexity of the project. From the correlation analysis result, a prediction model was
developed using multiple regression analysis. The result indicated that to control the
time performance of refurbishment projects in Singapore, three variables need to be
given more attention through the equation of Time Performance= 0.945+
0.076Finance-NP + 0.035Contractual-CD + 0.076Site-UC.
From the findings, it could be concluded that the time performance of refurbishment
projects is affected by the project characteristics. Thus, more focus probably needs to be
given to those factors in order to improve the time performance of refurbishment
projects in Singapore. |
|---|