Factors affecting time performance of refurbishment projects in Singapore / Chew Lee Fuan
Refurbishment is becoming an important economic driver in Singapore’s construction industry due to existence of high number of ageing buildings, limited vacant land for new development and the rapid changes of technology used. There are limitations and even drawbacks to these efforts as the time...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
2012
|
| Subjects: | |
| Online Access: | http://pendeta.um.edu.my/client/default/search/results?qu=Factors+affecting+time+performance+of+refurbishment+projects+in+Singapore&te= http://studentsrepo.um.edu.my/3591/13/TITLE_PAGE%252C_ABSTRACT%252C_CONTENT.pdf http://studentsrepo.um.edu.my/3591/5/FULL_CHAPTERS.pdf http://studentsrepo.um.edu.my/3591/6/REFERENCES_%26_APPENDICES.pdf |
Internet
http://pendeta.um.edu.my/client/default/search/results?qu=Factors+affecting+time+performance+of+refurbishment+projects+in+Singapore&te=http://studentsrepo.um.edu.my/3591/13/TITLE_PAGE%252C_ABSTRACT%252C_CONTENT.pdf
http://studentsrepo.um.edu.my/3591/5/FULL_CHAPTERS.pdf
http://studentsrepo.um.edu.my/3591/6/REFERENCES_%26_APPENDICES.pdf