Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Projec...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2003
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/2770/ |