An integrated value management (IVM) framework for contractors in design and build (D&B) projects / Siti Hamidah Abdul Hamid
The concept of ‘integrated value management’ or IVM in the construction industry refers to joining a number of various elements into a specific project to move, operate and function harmoniously with the ultimate aim of achieving successful outcomes. Value management (VM) as a process improvement...
| Main Author: | Abdul Hamid, Siti Hamidah |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2014
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/25821/ |
Similar Items
Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai
by: Roszai, Muhammad Hafizudin
Published: (2013)
by: Roszai, Muhammad Hafizudin
Published: (2013)
Energy efficiency principle of tranditional Malay house / Nor 'Atikah Zainuddin
by: Zainuddin, Nor Atikah
Published: (2015)
by: Zainuddin, Nor Atikah
Published: (2015)
Development of main contractor and subcontractor relationship (MACSOR) framework for Malaysian construction projects / Siti Hamidah Abdull Rahman
by: Abdull Rahman, Siti Hamidah
Published: (2018)
by: Abdull Rahman, Siti Hamidah
Published: (2018)
A study of building plan approval for extension and renovation work (individual application) / Ahmad Faisal Mohd Isa
by: Mohd Isa, Ahmad Faisal
Published: (2008)
by: Mohd Isa, Ahmad Faisal
Published: (2008)
Administrative reform of Majlis Bandaraya Melaka Bersejarah in term of parking service / Amira Zainura Zainal Abidin and Mohd Khairul Insan Nazri
by: Zainal Abidin, Amira Zainura, et al.
Published: (2008)
by: Zainal Abidin, Amira Zainura, et al.
Published: (2008)
Late and non-payments issues in the Malaysian construction industry : perspective of building material suppliers / Mohd Fisal Ishak, Kartina Alauddin and Mohd Shahrol Hafiz Ibrahim
by: Mohd Fisal, Ishak, et al.
Published: (2019)
by: Mohd Fisal, Ishak, et al.
Published: (2019)
Assessing health and safety practice for refurbishment work at Klang Valley / Muhammad Muzakkir Ismail
by: Ismail, Muhammad Muzakkir
Published: (2015)
by: Ismail, Muhammad Muzakkir
Published: (2015)
A study on space and facilities management in public school (special education integration program in Klang Valley) / Siti Aishah Maseroo
by: Maseroo, Siti Aishah
Published: (2011)
by: Maseroo, Siti Aishah
Published: (2011)
The influence of dwelling design on the performance of indoor ventilation / Siti Suhaila Mohd Hashim
by: Mohd Hashim, Siti Suhaila
Published: (2015)
by: Mohd Hashim, Siti Suhaila
Published: (2015)
The applicability of disabled access and facilities at bus terminals in Klang Valley / Nur Hasliana Hassan
by: Hassan, Nur Hasliana
Published: (2015)
by: Hassan, Nur Hasliana
Published: (2015)
The effectiveness of ready mixed concrete / Norazman Shahabudin
by: Shahabudin, Norazman
Published: (2005)
by: Shahabudin, Norazman
Published: (2005)
Garis panduan proses dalam meluluskan perletakan stesen minyak. Kajian kes : Bangsar / Ahmad Johari Hj Zakry
by: Ahmad Johari, Hj Zakry
Published: (1993)
by: Ahmad Johari, Hj Zakry
Published: (1993)
The identification of facilities management standard service category for industry / Zuraihana Ahmad Zawawi ... [et al.]
by: Zuraihana, Ahmad Zawawi, et al.
Published: (2016)
by: Zuraihana, Ahmad Zawawi, et al.
Published: (2016)
Expressions and stylistic trends of homeowners in terrace housing / Masran Saruwono, Abdurrahman Mohd Rashid and Erdayu Os’hara Omar.
by: Saruwono, Masran, et al.
Published: (2018)
by: Saruwono, Masran, et al.
Published: (2018)
Study of construction and maintenance of slope in Klang Valley highway / Nadzren Ahayalimudin
by: Ahayalimudin, Nadzren
Published: (2009)
by: Ahayalimudin, Nadzren
Published: (2009)
The importance of dilapidation survey before the commencement of construction work in Malaysia / Nurul Afiqah Mohammad Batni
by: Mohammad Batni, Nurul Afiqah
Published: (2015)
by: Mohammad Batni, Nurul Afiqah
Published: (2015)
Adapting by altering: spatial modifications of terraced houses in the Klang Valley area / Erdayu Os’hara Omar, Esmawee Endut and Masran Saruwono
by: Omar, Erdayu Os’hara, et al.
Published: (2017)
by: Omar, Erdayu Os’hara, et al.
Published: (2017)
A study on the user perception of the safety aspect at the extreme park / Nor Farah Aida Mohamed Zeble
by: Mohamed Zeble, Nor Farah Aida
Published: (2015)
by: Mohamed Zeble, Nor Farah Aida
Published: (2015)
A study on inventory system in UiTM Shah Alam (main campus) / Nor Khalilah Rosli
by: Rosli, Nor Khalilah
Published: (2009)
by: Rosli, Nor Khalilah
Published: (2009)
Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli
by: Zulkifli, Muhammad Farhan
Published: (2009)
by: Zulkifli, Muhammad Farhan
Published: (2009)
Laporan cadangan mengubahsuai rekabentuk dalaman untuk UMW Toyota Motor Sdn Bhd di Lot 4798, Jalan Kuala Kangsar, 30100 Ipoh, Perak / Ahmad Faizal Jaffar
by: Jaffar, Ahmad Faizal
Published: (2006)
by: Jaffar, Ahmad Faizal
Published: (2006)
Risk management plan (RMP) : implementation and challenges towards sustainability and green concept for public projects in Terengganu / Yuhainis Abdul Talib, Siti Nirwana Mat Usof and Kharizam Ismail
by: Yuhainis, Abdul Talib, et al.
Published: (2015)
by: Yuhainis, Abdul Talib, et al.
Published: (2015)
Effect of building orientation on indoor microclimate of classroom buildings at the Kaduna State University / Markus Bulus.
by: Bulus, Markus
Published: (2018)
by: Bulus, Markus
Published: (2018)
Pad foundation process for klinik kesihatan 3 Rantau Panjang Kelantan / Mohd Faiz Mohd Juhari
by: Mohd Faiz, Mohd Juhari
Published: (2018)
by: Mohd Faiz, Mohd Juhari
Published: (2018)
Perniagaan informal di Pusat Bandar Batu Gajah, Perak / Nur Atika Syazila Muda dan Mimi Rozaida Mohamed Roduan
by: Muda, Nur Atika Syazila, et al.
Published: (2010)
by: Muda, Nur Atika Syazila, et al.
Published: (2010)
E-Safe Sdn. Bhd / Erzura Najwa Othman … [et al.]
by: Othman, Erzura Najwa, et al.
Published: (2004)
by: Othman, Erzura Najwa, et al.
Published: (2004)
Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]
by: Ahmad Izzulhafiz, Musalakmal, et al.
Published: (2019)
by: Ahmad Izzulhafiz, Musalakmal, et al.
Published: (2019)
A study on strategies of Sarawak Consolidated Industries Berhad (SCIB) to achieve competitive advantages in industrialised building system (IBS) industries in Kuching /
Abu Bakar Ahmat and Rosalina Suai
by: Ahmat, Abu Bakar, et al.
Published: (2014)
by: Ahmat, Abu Bakar, et al.
Published: (2014)
TH Selbon Tower, Kuala Lumpur / Andrea Daling ... [et al.]
by: Andrea, Daling, et al.
Published: (2019)
by: Andrea, Daling, et al.
Published: (2019)
Improving skilled workers' performance in construction projects in Nigeria
by: Alhaji Ali, Zannah
Published: (2016)
by: Alhaji Ali, Zannah
Published: (2016)
Indicators for measuring satisfaction towards design quality of buildings
by: Suratkon, Azeanita, et al.
Published: (2016)
by: Suratkon, Azeanita, et al.
Published: (2016)
A study of defect analysis in medium cost apartment / Richeal Anak Andrice
by: Anak Andrice, Richeal
Published: (2013)
by: Anak Andrice, Richeal
Published: (2013)
The contractors’ attributes for the construction project success / Mohd Hafiz Saberi ... [et al.]
by: Mohd Hafiz, Saberi, et al.
Published: (2015)
by: Mohd Hafiz, Saberi, et al.
Published: (2015)
Critical success factors for UiTM contractors in Malaysia / Hamimah Adnan … [et al.]
by: Adnan, Hamimah, et al.
Published: (2012)
by: Adnan, Hamimah, et al.
Published: (2012)
Satu kajiselidik mengenai pandangan penghuni-penghuni terhadap rumah awam kos rendah di kawasan Bandar Tun Abdul Razak, Cheras, Kuala Lumpur / Mahdan Mohamed
by: Mahdan, Mohamed
Published: (1985)
by: Mahdan, Mohamed
Published: (1985)
Identification of common problems faced by the Bumiputera contractors / Ad. Johan Abdullah
by: Abdullah, Ad.Johan
Published: (2006)
by: Abdullah, Ad.Johan
Published: (2006)
Development of a building information modelling (BIM) migration path model for construction professionals
by: Brahim, Juliana
Published: (2018)
by: Brahim, Juliana
Published: (2018)
An enhancement of home safety grilles in preventing property crimes. Case study: Shah Alam, Selangor / Mohd Norhan Dulkahar and Erwin Rezasyah
by: Dulkahar, Mohd Norhan, et al.
Published: (2012)
by: Dulkahar, Mohd Norhan, et al.
Published: (2012)
Approval of work / Muhammad Ariff Imran Ruzlan
by: Muhammad Ariff Imran, Ruzlan
Published: (2017)
by: Muhammad Ariff Imran, Ruzlan
Published: (2017)
Workplace stress experienced by contractor in Malaysian construction industry
by: Omar, Roshartini, et al.
Published: (2018)
by: Omar, Roshartini, et al.
Published: (2018)
Similar Items
-
Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai
by: Roszai, Muhammad Hafizudin
Published: (2013) -
Energy efficiency principle of tranditional Malay house / Nor 'Atikah Zainuddin
by: Zainuddin, Nor Atikah
Published: (2015) -
Development of main contractor and subcontractor relationship (MACSOR) framework for Malaysian construction projects / Siti Hamidah Abdull Rahman
by: Abdull Rahman, Siti Hamidah
Published: (2018) -
A study of building plan approval for extension and renovation work (individual application) / Ahmad Faisal Mohd Isa
by: Mohd Isa, Ahmad Faisal
Published: (2008) -
Administrative reform of Majlis Bandaraya Melaka Bersejarah in term of parking service / Amira Zainura Zainal Abidin and Mohd Khairul Insan Nazri
by: Zainal Abidin, Amira Zainura, et al.
Published: (2008)