Relationship between project liability period and project quality / Nor Akmal Tarmizi

The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability peri...

Full description

Bibliographic Details
Main Author: Tarmizi, Nor Akmal
Format: Student Project
Language:English
Published: Faculty of Civil Engineering 2006
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/21652/
_version_ 1848805302271475712
author Tarmizi, Nor Akmal
author_facet Tarmizi, Nor Akmal
author_sort Tarmizi, Nor Akmal
building UiTM Institutional Repository
collection Online Access
description The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability periods in order to avoid the further liability on the project defects. As an example, in Malaysia, normally people will buy house before it is completed while in another country people will normally buy a completed house. Some developers will construct a project without really taking into consideration the project quality after completion. Many construction companies in Malaysia are not certified to ISO quality standard. Therefore, many projects are completed without fully complying with the required specifications and standards. This is not a good phenomenon in the nation construction industry. The result of this project show there is a relationship between project liability period and project quality. When defects liability period increase, the total defect will decrease. That is mean more total defect will give lower project quality. Defects liability period must amendment to suitable period to get better project quality.
first_indexed 2025-11-14T22:08:52Z
format Student Project
id uitm-21652
institution Universiti Teknologi MARA
institution_category Local University
language English
last_indexed 2025-11-14T22:08:52Z
publishDate 2006
publisher Faculty of Civil Engineering
recordtype eprints
repository_type Digital Repository
spelling uitm-216522018-10-23T04:40:37Z https://ir.uitm.edu.my/id/eprint/21652/ Relationship between project liability period and project quality / Nor Akmal Tarmizi Tarmizi, Nor Akmal Industrial engineering. Management engineering The topic will discuss about the relationship between defects liability period and project quality after completion. The objectives of this topic are to study the sufficiency and the defect liability period in relations to the project quality. Developers want to avoid a long defect liability periods in order to avoid the further liability on the project defects. As an example, in Malaysia, normally people will buy house before it is completed while in another country people will normally buy a completed house. Some developers will construct a project without really taking into consideration the project quality after completion. Many construction companies in Malaysia are not certified to ISO quality standard. Therefore, many projects are completed without fully complying with the required specifications and standards. This is not a good phenomenon in the nation construction industry. The result of this project show there is a relationship between project liability period and project quality. When defects liability period increase, the total defect will decrease. That is mean more total defect will give lower project quality. Defects liability period must amendment to suitable period to get better project quality. Faculty of Civil Engineering 2006-04 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/21652/1/PPb_NOR%20AKMAL%20TARMIZI%20EC%20P%2006_5.pdf Tarmizi, Nor Akmal (2006) Relationship between project liability period and project quality / Nor Akmal Tarmizi. (2006) [Student Project] (Submitted)
spellingShingle Industrial engineering. Management engineering
Tarmizi, Nor Akmal
Relationship between project liability period and project quality / Nor Akmal Tarmizi
title Relationship between project liability period and project quality / Nor Akmal Tarmizi
title_full Relationship between project liability period and project quality / Nor Akmal Tarmizi
title_fullStr Relationship between project liability period and project quality / Nor Akmal Tarmizi
title_full_unstemmed Relationship between project liability period and project quality / Nor Akmal Tarmizi
title_short Relationship between project liability period and project quality / Nor Akmal Tarmizi
title_sort relationship between project liability period and project quality / nor akmal tarmizi
topic Industrial engineering. Management engineering
url https://ir.uitm.edu.my/id/eprint/21652/