Structural design of RCC building using integrated BIM-based design workflow and analysis result comparison between ETABS and RSAP

Rapid computerization and stakeholder integration in the construction industry stressed the need for a new design methodology that was only possible through BIM. To address the inefficiency and limitations of conventional design flow that lead to design clashes, information loss, delays, and poo...

Full description

Bibliographic Details
Main Authors: Muhammad Yousaf, Mohammad Sohail, Muhammad Tayyab, Muhammad Javedan, Muhammad Habib
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2024
Online Access:http://journalarticle.ukm.my/25141/
http://journalarticle.ukm.my/25141/1/20.pdf