Modelling asset management of railway overhead line equipment
The overhead line equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system. There is a need to evaluate OLE asset management strategies through a whole life cost analysis that considers degradation processes and maintenance activities of the OLE components so t...
| Main Authors: | Kilsby, P., Remenyte-Prescott, Rasa, Andrews, John D. |
|---|---|
| Format: | Conference or Workshop Item |
| Published: |
2016
|
| Online Access: | https://eprints.nottingham.ac.uk/34255/ |
Similar Items
A modelling approach for railway overhead line equipment asset management
by: Kilsby, Paul, et al.
Published: (2017)
by: Kilsby, Paul, et al.
Published: (2017)
Modelling railway overhead line equipment asset management
by: Kilsby, Paul
Published: (2017)
by: Kilsby, Paul
Published: (2017)
Modelling the effects of asset management decisions on a railway track section
by: Prescott, Darren, et al.
Published: (2014)
by: Prescott, Darren, et al.
Published: (2014)
A stochastic model for railway track asset management
by: Andrews, John, et al.
Published: (2014)
by: Andrews, John, et al.
Published: (2014)
Towards a real-time Structural Health Monitoring of railway bridges
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
Railway bridge structural health monitoring and fault detection: state-of-the-art methods and future challenges
by: Vagnoli, Matteo, et al.
Published: (2018)
by: Vagnoli, Matteo, et al.
Published: (2018)
A fuzzy-based Bayesian Belief Network approach for railway bridge condition monitoring and fault detection
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
A Petri Net-based life cycle cost analysis approach
by: Kilsby, Paul, et al.
Published: (2018)
by: Kilsby, Paul, et al.
Published: (2018)
A holistic approach to railway infrastructure asset
management
by: Rama, Dovile, et al.
Published: (2015)
by: Rama, Dovile, et al.
Published: (2015)
Extended Bow-Tie model for asset risk and reliability modeling: application to a passenger lift
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
Fault propagation modelling for fluid system health monitoring
by: Remenyte-Prescott, Rasa, et al.
Published: (2011)
by: Remenyte-Prescott, Rasa, et al.
Published: (2011)
A fault detection method for railway point systems
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
A mathematical programming approach to railway network asset
management
by: Fecarotti, Claudia, et al.
Published: (2018)
by: Fecarotti, Claudia, et al.
Published: (2018)
Optimising strategy selection for the management of railway assets
by: Fecarotti, C., et al.
Published: (2017)
by: Fecarotti, C., et al.
Published: (2017)
Railway infrastructure asset management: the whole-system life cost analysis
by: Rama, Dovile, et al.
Published: (2016)
by: Rama, Dovile, et al.
Published: (2016)
A data mining tool for detecting and predicting abnormal behaviour of railway tunnels
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
Railway bridge asset management using a Petri-Net modelling approach
by: Yianni, Panayioti C., et al.
Published: (2016)
by: Yianni, Panayioti C., et al.
Published: (2016)
An efficient real-time method of analysis for non-coherent fault trees
by: Remenyte-Prescott, Rasa, et al.
Published: (2009)
by: Remenyte-Prescott, Rasa, et al.
Published: (2009)
Analysis of non-coherent fault trees using ternary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
An enhanced component connection method for conversion of fault trees to binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
Prime implicants for modularised non-coherent fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2007)
by: Remenyte-Prescott, Rasa, et al.
Published: (2007)
Qualitative analysis of complex modularized fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2006)
by: Remenyte-Prescott, Rasa, et al.
Published: (2006)
Quantifying the impact of variability in railway bridge asset management
by: Yianni, P.C., et al.
Published: (2018)
by: Yianni, P.C., et al.
Published: (2018)
Modelling railway bridge asset management
by: Le, Bryant Linh Hai
Published: (2014)
by: Le, Bryant Linh Hai
Published: (2014)
Railway track asset management modelling
by: Clarke, Steve
Published: (2021)
by: Clarke, Steve
Published: (2021)
Modelling methodologies for railway asset management
by: Lee, Robert
Published: (2021)
by: Lee, Robert
Published: (2021)
A Petri-Net-based modelling approach to railway bridge asset management
by: Yianni, Panayioti C., et al.
Published: (2016)
by: Yianni, Panayioti C., et al.
Published: (2016)
Incorporating local environmental factors into railway bridge asset management
by: Yianni, Panayioti C., et al.
Published: (2016)
by: Yianni, Panayioti C., et al.
Published: (2016)
Road network modelling for maintenance planning
by: Yang, C., et al.
Published: (2014)
by: Yang, C., et al.
Published: (2014)
Road maintenance planning using network flow modelling
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Application of network traffic flow model to road maintenance
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Railway bridge fault detection using Bayesian belief network
by: Vagnoli, M., et al.
Published: (2017)
by: Vagnoli, M., et al.
Published: (2017)
A network traffic flow model for motorway and urban highways
by: Yang, Chao, et al.
Published: (2014)
by: Yang, Chao, et al.
Published: (2014)
A modelling approach to railway bridge asset management
by: Yianni, Panayioti C.
Published: (2017)
by: Yianni, Panayioti C.
Published: (2017)
An efficient phased mission reliability analysis for autonomous vehicles
by: Remenyte-Prescott, Rasa, et al.
Published: (2010)
by: Remenyte-Prescott, Rasa, et al.
Published: (2010)
A sensor selection method for fault diagnostics
by: Reeves, J., et al.
Published: (2017)
by: Reeves, J., et al.
Published: (2017)
Pavement maintenance scheduling using genetic algorithms
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
A reliability-based prognostics framework for railway track management
by: ChiachÃo, Juan, et al.
Published: (2017)
by: ChiachÃo, Juan, et al.
Published: (2017)
Whole system approaches to railway asset management
by: Litherland, Jack J.M.
Published: (2019)
by: Litherland, Jack J.M.
Published: (2019)
GEOTECHNICAL ASSET MANAGEMENT FOR UK RAILWAY EMBANKMENTS
by: Siino, Giulia
Published: (2023)
by: Siino, Giulia
Published: (2023)
Similar Items
-
A modelling approach for railway overhead line equipment asset management
by: Kilsby, Paul, et al.
Published: (2017) -
Modelling railway overhead line equipment asset management
by: Kilsby, Paul
Published: (2017) -
Modelling the effects of asset management decisions on a railway track section
by: Prescott, Darren, et al.
Published: (2014) -
A stochastic model for railway track asset management
by: Andrews, John, et al.
Published: (2014) -
Towards a real-time Structural Health Monitoring of railway bridges
by: Vagnoli, Matteo, et al.
Published: (2017)