Modelling asset management of railway overhead line equipment

The overhead line equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system. There is a need to evaluate OLE asset management strategies through a whole life cost analysis that considers degradation processes and maintenance activities of the OLE components so t...

Full description

Bibliographic Details
Main Authors: Kilsby, P., Remenyte-Prescott, Rasa, Andrews, John D.
Format: Conference or Workshop Item
Published: 2016
Online Access:https://eprints.nottingham.ac.uk/34255/