Adaptive selection of heuristics for improving exam timetables
This paper presents a hyper-heuristic approach which hybridises low-level heuristic moves to improve timetables. Exams which cause a soft-constraint violation in the timetable are ordered and rescheduled to produce a better timetable. It is observed that both the order in which exams are rescheduled...
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Published: |
Springer
2014
|
| Online Access: | https://eprints.nottingham.ac.uk/28276/ |