Analysis of the Overall Equipment Effectiveness Losses and the Application of Continuous Improvement Techniques to Increase Productivity in Ecolab Leeds
At present customers’ expectations have increased worldwide for practically all businesses. Quality and cost have become a requisite, with customers now expecting companies to offer more flexibility in terms of product mix, or improved speed of deliveries. Ecolab is a company that specialises in pro...
| Main Author: | Gonzalez Puente, Marisela |
|---|---|
| Format: | Dissertation (University of Nottingham only) |
| Language: | English |
| Published: |
2014
|
| Online Access: | https://eprints.nottingham.ac.uk/27578/ |
Similar Items
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020)
by: Lance, Clarence, et al.
Published: (2020)
Occupant satisfaction in LEED and non-LEED certified buildings
by: Altomonte, Sergio, et al.
Published: (2013)
by: Altomonte, Sergio, et al.
Published: (2013)
Overall equipment effectiveness improvement through total productive maintenance in assembly cell
by: Ismail, Napsiah, et al.
Published: (2013)
by: Ismail, Napsiah, et al.
Published: (2013)
Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance
by: Amir, Azizi
Published: (2015)
by: Amir, Azizi
Published: (2015)
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
by: Aina Nadia Aida, Mohd Latif
Published: (2015)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Total Productive Maintenance (TPM) in Manufacturing Industries
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
Influence of factors unrelated to environmental quality on occupant satisfaction in LEED and non-LEED certified buildings
by: Schiavon, Stefano, et al.
Published: (2014)
by: Schiavon, Stefano, et al.
Published: (2014)
Analysis and countermeasure to improve production system performance by using overall equipment effectiveness at bi technologies sdn. Bhd.
by: Beh, Alicia
Published: (2013)
by: Beh, Alicia
Published: (2013)
Analysis and countermeasure to improve machine efficiency by using overall equipment effectiveness (OEE) method
by: Law, Jessica Ka Ing
Published: (2015)
by: Law, Jessica Ka Ing
Published: (2015)
Improvement of Overall Equipment Effectiveness (OEE) through Implementation of Autonomous Maintenance in Crankcase Line
by: A. R., Razali, et al.
Published: (2015)
by: A. R., Razali, et al.
Published: (2015)
Predicting Transportation Outcomes for LEED Projects
by: Ewing, R., et al.
Published: (2013)
by: Ewing, R., et al.
Published: (2013)
Analysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry
by: Nur Syahirah, Ismail
Published: (2016)
by: Nur Syahirah, Ismail
Published: (2016)
Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
by: Mohamad Hafiz Mohd Rosli,
Published: (2020)
Particular model for improving failure mode and effect analysis (FMEA) by using of overall equipment efficiency (OEE)
by: Esmaeilian, Gholamreza, et al.
Published: (2008)
by: Esmaeilian, Gholamreza, et al.
Published: (2008)
A Framework for Measuring The Effect of Changeover Time To
Overall Equipment Effectiveness
by: Muhamad Arifpin, Mansor, et al.
Published: (2015)
by: Muhamad Arifpin, Mansor, et al.
Published: (2015)
Integration Of Overall Equipment Effectiveness
(Oee) And Reliability For Measuring Machine
Effectiveness
by: Samat, Hasnida Ab
Published: (2010)
by: Samat, Hasnida Ab
Published: (2010)
Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
Occupant satisfaction in LEED and BREEAM-certified office buildings
by: Altomonte, Sergio, et al.
Published: (2016)
by: Altomonte, Sergio, et al.
Published: (2016)
Predicting transportation outcomes for LEED-ND Pilot Projects
by: Greene, William, et al.
Published: (2013)
by: Greene, William, et al.
Published: (2013)
Overall Equipment Effectiveness (OEE) Through Total Productive Maintenance (TPM) Practices - A Study Across The Malaysia Industries
by: Kaliannan, Batumalay
Published: (2010)
by: Kaliannan, Batumalay
Published: (2010)
Developmeny Of A Visual Display As A Monitoring System To Calculate Overall Equipment Effectiveness (OEE)
by: Lee, Yee Von
Published: (2017)
by: Lee, Yee Von
Published: (2017)
A comprehensive analysis of the credits obtained by LEED 2009 certified green buildings
by: Wu, Peng, et al.
Published: (2017)
by: Wu, Peng, et al.
Published: (2017)
Estimation of heat losses from process piping and equipment
by: Bahadori, Alireza, et al.
Published: (2010)
by: Bahadori, Alireza, et al.
Published: (2010)
Application of SMES unit to improve the overall Performance of DFIG-based WECS
by: Khamaira, Mahmoud Yousef, et al.
Published: (2014)
by: Khamaira, Mahmoud Yousef, et al.
Published: (2014)
Improving equipment effectiveness by designing optimal production process
by: Okhovat, Mohammad Amin, et al.
Published: (2012)
by: Okhovat, Mohammad Amin, et al.
Published: (2012)
Mandarin version of the Leeds Dyspepsia Questionnaire: a valid instrument for assessing symptoms in Asians
by: Leow, Hwong Ruey, et al.
Published: (2014)
by: Leow, Hwong Ruey, et al.
Published: (2014)
A Study On Overall Equipment Effectiveness (OEE) For Performance Measurement Case Study For Surface Mount Technology (SMT) Department
by: Shamsudin, Siti Nor Atiqah
Published: (2018)
by: Shamsudin, Siti Nor Atiqah
Published: (2018)
Increasing ISO 9000 certification benefits: A continuous improvement approach
by: Terziovski, Mile, et al.
Published: (2007)
by: Terziovski, Mile, et al.
Published: (2007)
It stops with us: Peer responses increase availability of sterile injecting equipment
by: Higgs, Peter, et al.
Published: (2016)
by: Higgs, Peter, et al.
Published: (2016)
The effects of the choice of meta analysis model on the overall estimates for continuous data with missing standard deviations
by: Nik Ruzni, Nik Idris, et al.
Published: (2010)
by: Nik Ruzni, Nik Idris, et al.
Published: (2010)
A preliminary investigation of the transition from green building to green community: Insights from LEED ND
by: Wu, Peng, et al.
Published: (2018)
by: Wu, Peng, et al.
Published: (2018)
Regional variations of credits obtained by LEED 2009 Certified green buildings-A country level analysis
by: Wu, Peng, et al.
Published: (2017)
by: Wu, Peng, et al.
Published: (2017)
A decade review of the credits obtained by LEED v2.2 certified green building projects
by: Wu, Peng, et al.
Published: (2016)
by: Wu, Peng, et al.
Published: (2016)
Memorandum of understanding between Universiti Malaysia Sarawak and University of Leeds, 29 August 1994 (MoU)
by: Universiti Malaysia Sarawak
Published: (1994)
by: Universiti Malaysia Sarawak
Published: (1994)
Success factors of overall improvement of
microenterprises in Malaysia: an empirical
study
by: Alom, Fardous, et al.
Published: (2016)
by: Alom, Fardous, et al.
Published: (2016)
Overall processes capability index for assembly production lines
by: Abdolshah, Mohammad, et al.
Published: (2009)
by: Abdolshah, Mohammad, et al.
Published: (2009)
An empirical study of the choice of meta analysis model on the overall estimates for continuous data with missing standard deviations
by: Nik Idris, Nik Ruzni, et al.
Published: (2010)
by: Nik Idris, Nik Ruzni, et al.
Published: (2010)
An empirical study of the choice of meta analysis model on the overall estimates for continuous data with missing standard deviations
by: Nik Idris, Nik Ruzni, et al.
Published: (2010)
by: Nik Idris, Nik Ruzni, et al.
Published: (2010)
Malaysia overall politics
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
by: Syed Abdullah Idid, Syed Arabi
Published: (2016)
Task Analysis for Improving Training of Construction Equipment Operators
by: Proctor, R., et al.
Published: (2012)
by: Proctor, R., et al.
Published: (2012)
Similar Items
-
Improving production system performance using overall equipment effectiveness
by: Lance, Clarence, et al.
Published: (2020) -
Occupant satisfaction in LEED and non-LEED certified buildings
by: Altomonte, Sergio, et al.
Published: (2013) -
Overall equipment effectiveness improvement through total productive maintenance in assembly cell
by: Ismail, Napsiah, et al.
Published: (2013) -
Evaluation Improvement of Production Productivity Performance using Statistical Process Control, Overall Equipment Efficiency, and Autonomous Maintenance
by: Amir, Azizi
Published: (2015) -
Improvement of availability rate of overall equipment effectiveness (OEE) for CNC winding machine
by: Aina Nadia Aida, Mohd Latif
Published: (2015)