Dispatch Problems Due to Ramp Rate Constraints: Bottleneck Analysis and Solutions
This paper proposes a dispatch technique based on the analysis of the system ramp-up/down megawatts (MW). If a dispatch is feasible, it can be shown that the total unavailable ramp-up MW of all the slow units in any future time intervals must be less than or equal to the MW difference between the ma...
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Published: |
2003
|
| Subjects: | |
| Online Access: | http://shdl.mmu.edu.my/2537/ |