A Study on Cost Control Practices in Malaysia Construction Industry
Construction projects in Malaysia and the world over have found to be suffering from cost and time overruns. To avoid cost overrun, the causes and factors lead to this issue in Malaysia’s construction industry had been identified in this study. A questionnaire survey was carried out among 109 CIDB G...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.intimal.edu.my/440/ http://eprints.intimal.edu.my/440/1/39.docx |