Skip to content
VuFind
Advanced
  • Building capacity through scho...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Building capacity through school based engagement on dam safety program in Cameron Highlands
QR Code

Building capacity through school based engagement on dam safety program in Cameron Highlands

Melaka Declaration on Disaster Risk Reduction in Malaysia (2011) captured the future direction of the country on disaster risk reduction as well as its efforts towards implementing the priority areas for the Sendai Framework, 2015–2030 and together with SDG11 (Sustainable Goals 11: Sustainable Citie...

Full description

Bibliographic Details
Main Authors: Sabri Muda, Rahsidi, Tukiman, Izawati, Mohd. Hussain, Mohd. Ramzi, Rabe, Noor Suzilawati
Format: Book Chapter
Language:English
English
Published: Springer, Singapore 2020
Subjects:
G Geography (General)
GE Environmental Sciences
GF Human ecology. Anthropogeography
T Technology (General)
TA Engineering (General). Civil engineering (General)
TA166 Human engineering
TA170 Environmental engineering. Sustainable engineering
TD Environmental technology. Sanitary engineering
Online Access:http://irep.iium.edu.my/77225/
http://irep.iium.edu.my/77225/15/77225_Building%20capacity%20through%20school%20based%20engagement.pdf
http://irep.iium.edu.my/77225/16/77225_Building%20capacity%20through%20school%20based%20engagement_SCOPUS.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://irep.iium.edu.my/77225/
http://irep.iium.edu.my/77225/15/77225_Building%20capacity%20through%20school%20based%20engagement.pdf
http://irep.iium.edu.my/77225/16/77225_Building%20capacity%20through%20school%20based%20engagement_SCOPUS.pdf

Similar Items

  • Perception analysis on awareness and preparedness of community in Lembah Bertam, Cameron Highland, Malaysia
    by: Zen, Ismawi, et al.
    Published: (2017)
  • Safe havens and evacuation routes due to dam disaster
    by: Mamat, Ahmad Fadhli, et al.
    Published: (2019)
  • Respondents' area of preference when disaster strikes: a case study of Cameron Highland
    by: Rabe, Noor Suzilawati, et al.
    Published: (2019)
  • Baram dam issue can be overcome, says MP
    by: New Sarawak, Tribune
    Published: (2012)
  • Community awareness on the implementation of early warning system at Tenaga Nasional Berhad Sultan Abu Bakar hydroelectric scheme, Lembah Bertam, Cameron Highland
    by: Mohd. Hussain, Mohd. Ramzi, et al.
    Published: (2018)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips