Skip to content
VuFind
Advanced
  • Life cycle cost for constructi...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
Life cycle cost for construction projects. Input lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme)
QR Code

Life cycle cost for construction projects. Input lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme)

Input Lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme), Department of Architecture, Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia (15th October 2019)

Bibliographic Details
Main Author: Ayob, Mohd Fairullazi
Format: Proceeding Paper
Language:English
English
English
Published: 2019
Subjects:
T201 Patents. Trademarks
T55.4 Industrial engineering.Management engineering.
TA177.4 Engineering economy
TH845 Architectural engineering. Structural engineering of buildings
TX Home economics
TX955 Building operation and maintenance
Online Access:http://irep.iium.edu.my/75722/
http://irep.iium.edu.my/75722/1/KAED-ARCHITECT-LCC%20BEGINNING-PART%201%2014102019.pdf
http://irep.iium.edu.my/75722/2/invitation%20to%20give%20input%20lecture%20AAR7453-Dr.M.Fairullazi.pdf
http://irep.iium.edu.my/75722/3/Email-Professional%20Practice-Input%20Lecture%2023092019.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://irep.iium.edu.my/75722/
http://irep.iium.edu.my/75722/1/KAED-ARCHITECT-LCC%20BEGINNING-PART%201%2014102019.pdf
http://irep.iium.edu.my/75722/2/invitation%20to%20give%20input%20lecture%20AAR7453-Dr.M.Fairullazi.pdf
http://irep.iium.edu.my/75722/3/Email-Professional%20Practice-Input%20Lecture%2023092019.pdf

Similar Items

  • Life cycle cost (beginning) to procurement managers
    by: Ayob, Mohd Fairullazi
    Published: (2019)
  • EPM 102(2) - EKONOMI KEJURUTERAAN APRIL 07.
    by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
    Published: (2007)
  • EEK 475 ECONOMY AND MANAGEMENT ON POWER SYSTEM (JAN 2016)
    by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
  • UNIVERSITI SAINS MALAYSIA Second Semester Examination 2011/2012 Academic Session June 2012 EPM 102/2 – Engineering Economy [Ekonomi Kejuruteraan] Duration: 2 hours [Masa: 2 jam]
    by: Mekanik, Pusat Pengajian Kejuruteraan
    Published: (2012)
  • EUP 201 - EKONOMI KEJURUTERAAN APRIL 1997.
    by: PPKAW, Pusat Pengajian Kejuruteraan Awam
    Published: (1997)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips