Design of a heuristic for balancing a multi-stage production flow line

A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their ass...

Full description

Bibliographic Details
Main Authors: Kays, H. M. E., Karim, A. N. M., Tajudin, M. N. B., Abdesselam, M.
Format: Article
Language:English
Published: Trans Tech Publications, Switzerland 2015
Subjects:
Online Access:http://irep.iium.edu.my/48673/
http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf
_version_ 1848783334698647552
author Kays, H. M. E.
Karim, A. N. M.
Tajudin, M. N. B.
Abdesselam, M.
author_facet Kays, H. M. E.
Karim, A. N. M.
Tajudin, M. N. B.
Abdesselam, M.
author_sort Kays, H. M. E.
building IIUM Repository
collection Online Access
description A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their assembly works are illustrated through 22 different tasks. Some of the tasks have the processing times greater than the takt time and are categorized as extra-long tasks. Attempts were made to solve this intricate line balancing problem by adopting the Ranked Positional Weight (RPW) method. But the solution given by the RPW model loses its exactitude due to the presence of the extra-long tasks. In this research a heuristic approach based on RPW is developed through which the problem has been resolved in an efficient and effective manner and hence the proposed heuristic is deemed to be capable of balancing production lines having such extra-long tasks.
first_indexed 2025-11-14T16:19:42Z
format Article
id iium-48673
institution International Islamic University Malaysia
institution_category Local University
language English
last_indexed 2025-11-14T16:19:42Z
publishDate 2015
publisher Trans Tech Publications, Switzerland
recordtype eprints
repository_type Digital Repository
spelling iium-486732017-01-18T08:09:42Z http://irep.iium.edu.my/48673/ Design of a heuristic for balancing a multi-stage production flow line Kays, H. M. E. Karim, A. N. M. Tajudin, M. N. B. Abdesselam, M. TS155 Production management A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their assembly works are illustrated through 22 different tasks. Some of the tasks have the processing times greater than the takt time and are categorized as extra-long tasks. Attempts were made to solve this intricate line balancing problem by adopting the Ranked Positional Weight (RPW) method. But the solution given by the RPW model loses its exactitude due to the presence of the extra-long tasks. In this research a heuristic approach based on RPW is developed through which the problem has been resolved in an efficient and effective manner and hence the proposed heuristic is deemed to be capable of balancing production lines having such extra-long tasks. Trans Tech Publications, Switzerland 2015-07-20 Article PeerReviewed application/pdf en http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf Kays, H. M. E. and Karim, A. N. M. and Tajudin, M. N. B. and Abdesselam, M. (2015) Design of a heuristic for balancing a multi-stage production flow line. Advanced Materials Research, 1115. pp. 610-615. ISSN 1022-6680 doi:10.4028/www.scientific.net/AMR.1115.610
spellingShingle TS155 Production management
Kays, H. M. E.
Karim, A. N. M.
Tajudin, M. N. B.
Abdesselam, M.
Design of a heuristic for balancing a multi-stage production flow line
title Design of a heuristic for balancing a multi-stage production flow line
title_full Design of a heuristic for balancing a multi-stage production flow line
title_fullStr Design of a heuristic for balancing a multi-stage production flow line
title_full_unstemmed Design of a heuristic for balancing a multi-stage production flow line
title_short Design of a heuristic for balancing a multi-stage production flow line
title_sort design of a heuristic for balancing a multi-stage production flow line
topic TS155 Production management
url http://irep.iium.edu.my/48673/
http://irep.iium.edu.my/48673/
http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf