Presentation on Delphi Approach in research methodology class
The name ‘Delphi’ originates from the Greek Oracle’s skills of interpretation and foresight. This technique was developed by Norman Dalkey of the RAND Corporation in the 1950’s to generate data from a consensus of expert opinion for a U.S. Air Force sponsored military project. It has been used widel...
| Main Author: | Ayob, Mohd Fairullazi |
|---|---|
| Format: | Monograph |
| Language: | English English |
| Published: |
Kulliyah of Architecture and Enviromental Design, International Islamic University Malaysia
2014
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/42636/ http://irep.iium.edu.my/42636/1/Delphi_presentation_on_161014.pdf http://irep.iium.edu.my/42636/2/Scan_20141017.jpg |
Similar Items
Constraint of the results of modified Delphi study on enhancing the quality data input requirements of Life Cycle Cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017)
by: Mansor, Syaimasyaza, et al.
Published: (2017)
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017)
Identifying methodology to investigate cost data input in life cycle cost analysis of a building
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Identification of cost data input problems in life cycle cost analysis and the mitigation strategies
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
A literature review on the state and practice of life cycle cost (LCC) in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Life cycle cost
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
RPK 533 – Methodology And Technique Of Research
- December 2013 / January 2014
by: PPPBP, Pusat Pengajian Perumahan Bangunan Dan Perancangan
Published: (2013)
by: PPPBP, Pusat Pengajian Perumahan Bangunan Dan Perancangan
Published: (2013)
A methodological analysis of demolition works in Malaysia
by: Abdullah, Arham, et al.
Published: (2008)
by: Abdullah, Arham, et al.
Published: (2008)
Translation of social citizenship to architecture & built environment: A methodological review
by: Mohd Norizhar, Ismail, et al.
Published: (2017)
by: Mohd Norizhar, Ismail, et al.
Published: (2017)
Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Study on building information modeling (BIM) process flow in construction industry: a model exploratory approach to research
by: Nurulashikin, Daud
Published: (2014)
by: Nurulashikin, Daud
Published: (2014)
Meta-analysis of studies on eggshell concrete using mixed regression and response surface methodology
by: Beng, Wei Chong, et al.
Published: (2021)
by: Beng, Wei Chong, et al.
Published: (2021)
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018)
by: Ayob, Mohd Fairullazi
Published: (2018)
Proceedings of National Symposium on Tourism Research: Designing Tourism Research for Practical Applications
Published: (2008)
Published: (2008)
Proceedings of
2nd Regional Conference on Tourism Research: Venturing Into New Tourism Research
Published: (2011)
Published: (2011)
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019)
by: Mansor, Syaimasyaza, et al.
Published: (2019)
Analyzing Street Art to Present the Heritage of George Town, Malaysia
by: Sadatiseyedmahalleh, Seyedehelham, et al.
Published: (2015)
by: Sadatiseyedmahalleh, Seyedehelham, et al.
Published: (2015)
Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2019)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2019)
Proposed research for optimization of the performance of cooling system in data center facilities
by: Romadhon, Rahmat, et al.
Published: (2008)
by: Romadhon, Rahmat, et al.
Published: (2008)
Proceedings of
2nd National Symposium on Tourism Research: Theories and Applications
Published: (2009)
Published: (2009)
Proceedings of
Regional Conference on Tourism Research: The State of the Art and its Sustainability
Published: (2010)
Published: (2010)
Advanced e-presentation system of a work plan for improved project communication
by: Vendra, Venkata Krishna
Published: (2007)
by: Vendra, Venkata Krishna
Published: (2007)
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Research on the contributions of modern buildings to urban aesthetics / Ida Noorjulianti bt. Haji Sugijanto
by: Ida Noorjulianti, Haji Sugijanto
Published: (1988)
by: Ida Noorjulianti, Haji Sugijanto
Published: (1988)
Similar Items
-
Constraint of the results of modified Delphi study on enhancing the quality data input requirements of Life Cycle Cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013) -
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016) -
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011) -
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017) -
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017)