Time and cost performance of design-build projects
© 2015 American Society of Civil Engineers. The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts bein...
| Main Authors: | , , , , |
|---|---|
| Format: | Journal Article |
| Published: |
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/9975 |