Mine Waste Dump Optimisation Based on Carbon Footprint
Modern open-pit mining operations focus on maximizing net present value (NPV) while reducing haulage cost and carbon emissions. This study utilizes Mixed Integer Programming (MIP) to optimize net present value and minimize carbon footprints during production and waste dump scheduling. It proposes th...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2024
|
| Online Access: | http://hdl.handle.net/20.500.11937/97107 |