Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection
In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump min...
| Main Author: | Das, Ranajit |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2024
|
| Online Access: | http://hdl.handle.net/20.500.11937/95163 |
Similar Items
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007)
by: Hardy, Raymond J
Published: (2007)
The Mine Haul Road Optimisation Alliance - An industry and academia collaboration
by: Handel, D., et al.
Published: (2016)
by: Handel, D., et al.
Published: (2016)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
The anti-dumping petition against dumped tinplates: is it time to consider the nation’s welfare?
by: Ahamat, Haniff
Published: (2013)
by: Ahamat, Haniff
Published: (2013)
Haul road design considerations
by: Thompson, Roger
Published: (2009)
by: Thompson, Roger
Published: (2009)
Building Better Haul Roads
by: Thompson, Roger
Published: (2011)
by: Thompson, Roger
Published: (2011)
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
Haul Road Design and Operational Benchmarking
by: Thompson, Roger
Published: (2009)
by: Thompson, Roger
Published: (2009)
Haul road rolling resistance and pavement condition
by: Coffey, J., et al.
Published: (2018)
by: Coffey, J., et al.
Published: (2018)
The modelling prediction of haul road surface deflection
by: Coffey, J., et al.
Published: (2018)
by: Coffey, J., et al.
Published: (2018)
Mine haul road maintenance management systems
by: Thompson, Roger, et al.
Published: (2003)
by: Thompson, Roger, et al.
Published: (2003)
Selection, performance and economic evaluation of dust palliatives on surface mine haul roads
by: Thompson, Roger, et al.
Published: (2007)
by: Thompson, Roger, et al.
Published: (2007)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
10.6 Design, Construction, and Maintenance of Haul Roads
by: Thompson, Roger
Published: (2011)
by: Thompson, Roger
Published: (2011)
Mine haul road rolling resistance: influences and impacts
by: Coffey, Jarrad Patrick
Published: (2015)
by: Coffey, Jarrad Patrick
Published: (2015)
Mine Waste Dump Optimisation Based on Carbon Footprint
by: Tobgay, Namgyel Sithup
Published: (2024)
by: Tobgay, Namgyel Sithup
Published: (2024)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
Haul Road Defect Identification Using Measured Truck Response
by: Hugo, D., et al.
Published: (2008)
by: Hugo, D., et al.
Published: (2008)
Probabilistic Optimisation of Generation Scheduling Considering Wind Power Output and Stochastic Line Capacity
by: Banerjee, Binayak, et al.
Published: (2012)
by: Banerjee, Binayak, et al.
Published: (2012)
Mine haul road design and management: a review of current practice
by: Thompson, Roger
Published: (2011)
by: Thompson, Roger
Published: (2011)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
To ‘dump’ or not to ‘dump’: changing, supporting or distracting behavior
by: Kamaruddin, Azrina, et al.
Published: (2010)
by: Kamaruddin, Azrina, et al.
Published: (2010)
Optimizing open-pit block scheduling with exposed ore reserve
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
Mine Road Design and Management In Autonomous Hauling Operations: A Research Roadmap
by: Thompson, Roger
Published: (2011)
by: Thompson, Roger
Published: (2011)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Development of mine haul road surfacing condition monitoring through digital image processing
by: Hahn, S., et al.
Published: (2015)
by: Hahn, S., et al.
Published: (2015)
An investigation into opportunities for improvement of surface mine haul road functional design, construction and maintenance
by: Coffey, J., et al.
Published: (2018)
by: Coffey, J., et al.
Published: (2018)
Development of mine haul road surfacing condition monitoring through digital image processing
by: Thompson, Roger, et al.
Published: (2015)
by: Thompson, Roger, et al.
Published: (2015)
An investigation into opportunities for improvement of surface mine haul road functional design, construction and maintenance
by: Coffey, Jarrad P.
Published: (2012)
by: Coffey, Jarrad P.
Published: (2012)
Mine haul road design and management best practices for safe and cost-efficient truck haulage
by: Thompson, Roger
Published: (2010)
by: Thompson, Roger
Published: (2010)
The development of a real-time mine road maintenance management system using haul truck and road vibration signature analysis
by: Thompson, Roger, et al.
Published: (2003)
by: Thompson, Roger, et al.
Published: (2003)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Using Haulage Accidents and Incident Reports to Identify the Impact of Substandard Haul Road Design on Operational Safety
by: Thompson, Roger
Published: (2010)
by: Thompson, Roger
Published: (2010)
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
Parias sumatranus (Sumatran Pit Viper)
by: Das, I., et al.
Published: (2014)
by: Das, I., et al.
Published: (2014)
An Economics Analysis of Dumping and Antidumping
by: Li, Yan
Published: (2012)
by: Li, Yan
Published: (2012)
'Bayesian Optimisation for Nurse Scheduling'
by: Aickelin, Uwe, et al.
Published: (2004)
by: Aickelin, Uwe, et al.
Published: (2004)
Similar Items
-
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019) -
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021) -
Selection criteria for loading and hauling equipment - open pit mining applications
by: Hardy, Raymond J
Published: (2007) -
The Mine Haul Road Optimisation Alliance - An industry and academia collaboration
by: Handel, D., et al.
Published: (2016) -
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)