Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection
In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump min...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2024
|
| Online Access: | http://hdl.handle.net/20.500.11937/95163 |