Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection
In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump min...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2024
|
| Online Access: | http://hdl.handle.net/20.500.11937/95163 |
| _version_ | 1848765973736194048 |
|---|---|
| author | Das, Ranajit |
| author_facet | Das, Ranajit |
| author_sort | Das, Ranajit |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge
combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump mining including in-pit dumping, with the selection of shortest haulage from possible haul-road networks. Solution methodologies have been developed using exact and meta-heuristic methods and applied on several cases. |
| first_indexed | 2025-11-14T11:43:46Z |
| format | Thesis |
| id | curtin-20.500.11937-95163 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T11:43:46Z |
| publishDate | 2024 |
| publisher | Curtin University |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-951632024-05-27T01:27:52Z Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection Das, Ranajit In mining operations, selecting a schedule for waste mining and hauling to dump locations including in-pit dumps and ore to plants and stockpiles, through a network of roads, poses a huge combinatorial problem. A mathematical model has been proposed to simultaneously optimise pit and waste dump mining including in-pit dumping, with the selection of shortest haulage from possible haul-road networks. Solution methodologies have been developed using exact and meta-heuristic methods and applied on several cases. 2024 Thesis http://hdl.handle.net/20.500.11937/95163 Curtin University fulltext |
| spellingShingle | Das, Ranajit Stratified Deposit Production Schedule Optimisation Considering In-Pit Dumping and Haul Road Selection |
| title | Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection |
| title_full | Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection |
| title_fullStr | Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection |
| title_full_unstemmed | Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection |
| title_short | Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection |
| title_sort | stratified deposit production schedule optimisation
considering in-pit dumping and haul road selection |
| url | http://hdl.handle.net/20.500.11937/95163 |