When is a subsea anchor required for a short pipeline/SCR system?

© 2019 Elsevier Ltd Connection of floating production vessels to subsea pipelines requires careful consideration of the stresses placed on the steel catenary riser (SCR), subsea spool and pipeline end termination (PLET). Due to vessel motion, environmental conditions, flow conditions and pipelin...

Full description

Bibliographic Details
Main Authors: Reda, Ahmed, McKee, Kristoffer, Howard, Ian, Sultan, I.A.
Format: Journal Article
Language:English
Published: ELSEVIER SCI LTD 2019
Subjects:
Online Access:http://hdl.handle.net/20.500.11937/80586