A new model for open-pit production and waste-dump scheduling
An open-pit mine schedule defines the optimal sequence of mining valuable (ore) and waste material with the objective of maximizing the value of the project. Given this production schedule, a waste-dump schedule is then developed to determine the optimal waste-rock allocation in waste dumps. Thus, p...
| Main Authors: | Fu, Z., Asad, Mohammad Waqar, Topal, Erkan |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor and Francis
2019
|
| Online Access: | http://hdl.handle.net/20.500.11937/74506 |
Similar Items
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection
by: Das, Ranajit
Published: (2024)
by: Das, Ranajit
Published: (2024)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Stochastic production phase design for an open pit mining complex with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2014)
by: Asad, Mohammad Waqar, et al.
Published: (2014)
Performance evaluation of a new stochastic network flow approach to optimal open pit mine design - application at a gold mine
by: Asad, Mohammad Waqar, et al.
Published: (2012)
by: Asad, Mohammad Waqar, et al.
Published: (2012)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
by: Khan, A., et al.
Published: (2018)
by: Khan, A., et al.
Published: (2018)
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Characterizations of waste soil of open dumping area
by: Mohd Pauzi, Nur Irfah, et al.
Published: (2014)
by: Mohd Pauzi, Nur Irfah, et al.
Published: (2014)
A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
by: Khan, A., et al.
Published: (2019)
by: Khan, A., et al.
Published: (2019)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
by: Asad, Mohammad Waqar, et al.
Published: (2013)
by: Asad, Mohammad Waqar, et al.
Published: (2013)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Optimizing open-pit block scheduling with exposed ore reserve
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
by: Saavedra-Rosas, Jose, et al.
Published: (2016)
Production phase and ultimate pit limit design under commodity price uncertainty
by: Chatterjee, S., et al.
Published: (2016)
by: Chatterjee, S., et al.
Published: (2016)
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
by: Sandanayake, D., et al.
Published: (2014)
by: Sandanayake, D., et al.
Published: (2014)
A review of cut-off grade policy models for open pit mining operations
by: Asad, Mohammad, et al.
Published: (2016)
by: Asad, Mohammad, et al.
Published: (2016)
Geotechnical Properties of Waste Soil from Open Dumping Area in Malaysia.
by: Omar, Husaini, et al.
Published: (2011)
by: Omar, Husaini, et al.
Published: (2011)
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
A heuristic approach to optimal design of an underground mine stope layout
by: Sandanayake, D., et al.
Published: (2015)
by: Sandanayake, D., et al.
Published: (2015)
Respiratory health of children exposed to PM10: consequence of construction waste open dumping
by: Jeevanaraj, Pravina, et al.
Published: (2020)
by: Jeevanaraj, Pravina, et al.
Published: (2020)
A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Solid waste disposal comparison between open dumping and sanitary landfill (Kg. Pertok Machang, Kelantan (open dumping) and Puchong, Selangor (sanitary landfill) / Mohd Budiman Putra Hassan
by: Hassan, Mohd Budiman Putra
Published: (2003)
by: Hassan, Mohd Budiman Putra
Published: (2003)
Similar Items
-
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021) -
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014) -
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014) -
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016) -
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)