A new model for open-pit production and waste-dump scheduling

An open-pit mine schedule defines the optimal sequence of mining valuable (ore) and waste material with the objective of maximizing the value of the project. Given this production schedule, a waste-dump schedule is then developed to determine the optimal waste-rock allocation in waste dumps. Thus, p...

Full description

Bibliographic Details
Main Authors: Fu, Z., Asad, Mohammad Waqar, Topal, Erkan
Format: Journal Article
Published: Taylor and Francis 2019
Online Access:http://hdl.handle.net/20.500.11937/74506