Post-disaster multi-period road network repair: work scheduling and relief logistics optimization
We develop a multi-period bi-level programming model for the post-disaster road network repair work scheduling and relief logistics problem. A maximum relative satisfaction degree-based steady-state parallel genetic algorithm is designed to solve this model. In order to validate and test the effecti...
| Main Authors: | , |
|---|---|
| Format: | Journal Article |
| Published: |
Springer New York LLC
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/71117 |