Utilizing IFC for shield segment assembly in underground tunneling
© 2018 The shield method is a common approach used for subway tunnel excavation. A critical function of the shield method is the segment assembly process. It is, therefore, imperative to have access to information to be able to manage and control the performance of segment assembly during the constr...
| Main Authors: | , , , |
|---|---|
| Format: | Journal Article |
| Published: |
Elsevier BV
2018
|
| Online Access: | http://hdl.handle.net/20.500.11937/68736 |