Stochastic Project Scheduling with Hierarchical Alternatives

© 2017 In this paper, a resource constrained project scheduling problem with hierarchical alternatives and stochastic activity durations is studied. A stochastic chance constraint is introduced to formulate this problem. A metaheuristic framework called SAA/DAAA through integrating the sampling aver...

Full description

Bibliographic Details
Main Authors: Tao, S., Wu, Changzhi, Sheng, Z., Wang, Xiangyu
Format: Journal Article
Published: Elsevier 2018
Online Access:http://hdl.handle.net/20.500.11937/67034