Optimization of integrated production system using advanced proxy based models: A new approach

Hydrocarbon production can be elevated using gas lift especially when reservoir pressure declines throughout reservoir life. Specific amount of compressed gas distributes among wells during a gas lift operation through the orifice installed on the tubing string. Since the available gas is usually le...

Full description

Bibliographic Details
Main Authors: Ghassemzadeh, S., Hashempour Charkhi, Amir
Format: Journal Article
Published: Elsevier Inc. 2016
Online Access:http://hdl.handle.net/20.500.11937/63199