Optimization of integrated production system using advanced proxy based models: A new approach
Hydrocarbon production can be elevated using gas lift especially when reservoir pressure declines throughout reservoir life. Specific amount of compressed gas distributes among wells during a gas lift operation through the orifice installed on the tubing string. Since the available gas is usually le...
| Main Authors: | , |
|---|---|
| Format: | Journal Article |
| Published: |
Elsevier Inc.
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/63199 |