Safeguarding the integrity of Liquefied Natural Gas infrastructure assets with digitization: Case of a domestic gas metering upgrade project
© 2017 Elsevier B.V.Low productivity levels have contributed to the cost and schedule overruns that have plagued the construction of Liquefied Natural Gas (LNG) processing facilities in Australia. Traditional paper based methods such as Computer-Aided-Design have been relied upon to create, manage,...