Optimizing open-pit block scheduling with exposed ore reserve
© 2016 The Southern African Institute of Mining and Metallurgy.A crucial problem in the open pit mining industry is to determine the optimal block scheduling, defining how the orebody will be sequenced for exploitation. An orebody is often comprised of several thousand or million blocks and the sche...
| Main Authors: | , , , |
|---|---|
| Format: | Journal Article |
| Published: |
Southern African Institute of Mining and Metallurgy
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/62909 |