Hydro-dynamically controlled alteration of fractured Portland cements flowed by CO2-rich brine
Deficient sealing in the well cement plugs and annulus due to mechanical fracturing is an important risk of CO2 leakage from the reservoir to others permeable layers and the surface. Such situation was reproduced at laboratory scale in order to determine the hydro-chemical control on the fracture pe...
| Main Authors: | , , |
|---|---|
| Format: | Journal Article |
| Published: |
2013
|
| Online Access: | http://hdl.handle.net/20.500.11937/6194 |