Skip to content
VuFind
Advanced
  • MULTI-PERIOD STOCHASTIC MANPOW...
  • Cite this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
MULTI-PERIOD STOCHASTIC MANPOWER AND PRODUCTIVITY OPTIMIZATION IN A HIERARCHICAL SYSTEM
QR Code

MULTI-PERIOD STOCHASTIC MANPOWER AND PRODUCTIVITY OPTIMIZATION IN A HIERARCHICAL SYSTEM

Bibliographic Details
Main Authors: Sun, Y., Aw, G., Yu, C., Teo, Kok Lay, Chen, X.
Format: Conference Paper
Published: 2016
Online Access:http://hdl.handle.net/20.500.11937/52045
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://hdl.handle.net/20.500.11937/52045

Similar Items

  • Deterministic conversion of uncertain manpower planning optimization problem
    by: Li, B., et al.
    Published: (2018)
  • Multi-period portfolio optimization under probabilistic risk measure
    by: Sun, Y., et al.
    Published: (2016)
  • Multi-period portfolio selection problem under uncertain environment with bankruptcy constraint
    by: Li, B., et al.
    Published: (2018)
  • Post-disaster multi-period road network repair: work scheduling and relief logistics optimization
    by: Li, S., et al.
    Published: (2018)
  • Crisis Of Manpower Resources In Malaysian Construction Industry
    by: Chen, Kok Wai
    Published: (2013)

Search Options

  • Advanced Search

Find More

  • Browse the Catalog

Need Help?

  • Search Tips