A model for designing group task assessments
This study uses quasi-experimental method to develop a framework for peer assessment in group tasks. A total of 94 students who completed a first year CM undergraduate unit were analysed. The 10 criteria used in the peer assessment framework ensured all students within a group are mutually accountab...
| Main Author: | Olatunji, Oluwole |
|---|---|
| Format: | Conference Paper |
| Published: |
2016
|
| Online Access: | http://hdl.handle.net/20.500.11937/51376 |
Similar Items
Blending ‘Fair Dinkum’ into Group Assessment of Construction Students
by: Olatunji, Oluwole
Published: (2016)
by: Olatunji, Oluwole
Published: (2016)
A methodological argument for designing assessment of students' teamwork in problem-based learning
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
BIM-FM and Consequential Loss: how consequential can design models be?
by: Olatunji, Oluwole
Published: (2014)
by: Olatunji, Oluwole
Published: (2014)
Modelling the costs of corporate implementation of building information modelling
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Building Information Modelling and Intellectual Propertization: A Revolutionary Nirvana or a Disillusionment?
by: Olatunji, Oluwole
Published: (2014)
by: Olatunji, Oluwole
Published: (2014)
A preliminary review on the legal implications of BIM and model ownership
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Virtual reality and estimating practice: A software selection model for estimating
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Modelling organizations' structural adjustment to BIM adoption: a pilot study on estimating organisations
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Constructing Dispute Scenarios in Building Information Modeling
by: Olatunji, Oluwole
Published: (2016)
by: Olatunji, Oluwole
Published: (2016)
Views on building information modelling, procurement and contract management
by: Olatunji, Oluwole
Published: (2014)
by: Olatunji, Oluwole
Published: (2014)
Exploring the performance of Australian construction industry in a recent global recession
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
Causations of Failure in Megaprojects: A Case Study of the Ajaokuta Steel Plant Project
by: Olatunji, Oluwole
Published: (2018)
by: Olatunji, Oluwole
Published: (2018)
A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria
by: Olatunji, Oluwole
Published: (2008)
by: Olatunji, Oluwole
Published: (2008)
The Applications of Building Information Modelling in Facilities Management
by: Olatunji, Oluwole, et al.
Published: (2010)
by: Olatunji, Oluwole, et al.
Published: (2010)
Perspectives on modelling bim-enabled estimating practices
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
Review on bid or no bid decision factors
by: Olatunji, Oluwole
Published: (2016)
by: Olatunji, Oluwole
Published: (2016)
Editorial
by: Olatunji, Oluwole
Published: (2018)
by: Olatunji, Oluwole
Published: (2018)
Editorial
by: Olatunji, Oluwole
Published: (2015)
by: Olatunji, Oluwole
Published: (2015)
Editorial
by: Olatunji, Oluwole
Published: (2015)
by: Olatunji, Oluwole
Published: (2015)
Scaffolding industry knowledge on errors in construction estimates
by: Olatunji, Oluwole
Published: (2011)
by: Olatunji, Oluwole
Published: (2011)
The impact of oil price regimes on construction costs in Nigeria
by: Olatunji, Oluwole
Published: (2010)
by: Olatunji, Oluwole
Published: (2010)
Views on BIM, procurement and contract management
by: Olatunji, Oluwole
Published: (2014)
by: Olatunji, Oluwole
Published: (2014)
An ontology for analysing cognition in geometric and parametric design platforms: a review.
by: Yu, R., et al.
Published: (2014)
by: Yu, R., et al.
Published: (2014)
Management of Account Recievables: a pilot study of three Nigerian construction firms
by: Ogundare, T., et al.
Published: (2018)
by: Ogundare, T., et al.
Published: (2018)
Modelling Outcomes of Collaboration in Building Information Modelling Through Gaming Theory Lenses
by: Olatunji, Oluwole, et al.
Published: (2010)
by: Olatunji, Oluwole, et al.
Published: (2010)
Rurality, Nigeria's massification policy on access to basic education and turnover causations amongst teachers
by: Olatunji, Oluwole, et al.
Published: (2016)
by: Olatunji, Oluwole, et al.
Published: (2016)
Turnover Causation Amongst High School Teachers in Nigeria
by: Ajayi, S., et al.
Published: (2018)
by: Ajayi, S., et al.
Published: (2018)
Demographic analysis of turnover intentions amongst Nigerian high school teachers
by: Ajayi, S., et al.
Published: (2017)
by: Ajayi, S., et al.
Published: (2017)
Delay causations in marine infrastructures, a review
by: Karami, H., et al.
Published: (2018)
by: Karami, H., et al.
Published: (2018)
Building Information Modelling and Quantity Surveying Practice
by: Olatunji, Oluwole, et al.
Published: (2010)
by: Olatunji, Oluwole, et al.
Published: (2010)
Impact and Remedy of Legal Uncertainties in Building Information Modeling
by: Alwash, A., et al.
Published: (2017)
by: Alwash, A., et al.
Published: (2017)
A Comparative Analysis of 2D Computer-Aided Estimating (CAE) and BIM Estimating Procedures
by: Olatunji, Oluwole, et al.
Published: (2010)
by: Olatunji, Oluwole, et al.
Published: (2010)
Building Cost Planning for the Design Team
by: Smith, J., et al.
Published: (2016)
by: Smith, J., et al.
Published: (2016)
Demonstration tasks for assessment
by: Lowe, Ric, et al.
Published: (2017)
by: Lowe, Ric, et al.
Published: (2017)
Horizontal collaboration in logistics: A feasible task for group purchasing
by: Ghaderi, Hadi, et al.
Published: (2012)
by: Ghaderi, Hadi, et al.
Published: (2012)
Employing group work for task performances in a task-based learning classroom: evidence from a University in Thailand
by: Ulla, Mark Bedoya, et al.
Published: (2021)
by: Ulla, Mark Bedoya, et al.
Published: (2021)
Estimating in geometric 3D CAD
by: Olatunji, Oluwole, et al.
Published: (2015)
by: Olatunji, Oluwole, et al.
Published: (2015)
Latent Variables in Multidisciplinary Team Collaboration
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
An adaptive cyber-physical system’s approach to construction progress monitoring and control
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach
by: Signor, R., et al.
Published: (2016)
by: Signor, R., et al.
Published: (2016)
Similar Items
-
Blending ‘Fair Dinkum’ into Group Assessment of Construction Students
by: Olatunji, Oluwole
Published: (2016) -
A methodological argument for designing assessment of students' teamwork in problem-based learning
by: Olatunji, Oluwole
Published: (2011) -
BIM-FM and Consequential Loss: how consequential can design models be?
by: Olatunji, Oluwole
Published: (2014) -
Modelling the costs of corporate implementation of building information modelling
by: Olatunji, Oluwole
Published: (2011) -
Building Information Modelling and Intellectual Propertization: A Revolutionary Nirvana or a Disillusionment?
by: Olatunji, Oluwole
Published: (2014)