Point Estimate Method in Risk Analysis for Tunnel Support System Selection: A Case Study in Taloun Road Tunnel
Rock mass has generally inhomogeneous nature and required data to design underground structures are inadequate. These data are mainly obtained from site investigations and laboratory tests. So, out put uncertainties during construction process in the rock mass are inevitable. In this paper, a new ap...
| Main Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
n/a
2008
|
| Online Access: | http://hdl.handle.net/20.500.11937/4408 |