Equipment selection with heterogeneous fleets for multiple-period schedules
In a simple surface mining scenario we consider a mine to have one mining location and dumpsite connected by a truck route. We determine a purchase and salvage policy for trucks and loaders, which minimises the cost of materials handling over a multiple period schedule. This problem becomes large sc...
| Main Authors: | , , , |
|---|---|
| Format: | Journal Article |
| Published: |
Palgrave MacMillan
2011
|
| Online Access: | http://hdl.handle.net/20.500.11937/42582 |