Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practise mainly focuses on the ore...
| Main Authors: | Li, Y, Topal, Erkan, Ramazan, S. |
|---|---|
| Other Authors: | R. Dimitrakopoulos |
| Format: | Conference Paper |
| Published: |
The Australasian Institute of Mining and Metallurgy
2014
|
| Online Access: | http://hdl.handle.net/20.500.11937/41626 |
Similar Items
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018)
by: Li, Y., et al.
Published: (2018)
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016)
by: Li, Y., et al.
Published: (2016)
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014)
by: Ren, H., et al.
Published: (2014)
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)
by: Lin, Wei
Published: (2021)
A new model for open-pit production and waste-dump scheduling
by: Fu, Z., et al.
Published: (2019)
by: Fu, Z., et al.
Published: (2019)
Waste rock dumping optimisation using mixed integer programming (MIP)
by: Li, Yu, et al.
Published: (2013)
by: Li, Yu, et al.
Published: (2013)
A new open-pit mine planning optimization method using block aggregation and integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Flexible open-pit mine design under uncertainty
by: Groeneveld, Ben, et al.
Published: (2011)
by: Groeneveld, Ben, et al.
Published: (2011)
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
Developments in Mine Design, Planning and Scheduling in Open Cut Mining
by: Saydam, S., et al.
Published: (2012)
by: Saydam, S., et al.
Published: (2012)
Robust versus Flexible Open Pit Mine Design
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Stratified Deposit Production Schedule Optimisation
Considering In-Pit Dumping and Haul Road Selection
by: Das, Ranajit
Published: (2024)
by: Das, Ranajit
Published: (2024)
Long-term Open-pit Mine Production Scheduling with Grade Engineering
by: Fathollahzadeh, Karo
Published: (2022)
by: Fathollahzadeh, Karo
Published: (2022)
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
Determination of the transition Point from Open Pit to Underground Mining
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Mine Waste Dump Optimisation Based on Carbon Footprint
by: Tobgay, Namgyel Sithup
Published: (2024)
by: Tobgay, Namgyel Sithup
Published: (2024)
A new mathematical programming model for production schedule optimisation in underground mining operations
by: Nehring, M., et al.
Published: (2010)
by: Nehring, M., et al.
Published: (2010)
Strategic mine planning model using network flow model and real case application
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A new generic open pit mine planning process with risk assessment ability
by: Mai, N., et al.
Published: (2016)
by: Mai, N., et al.
Published: (2016)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Net present value maximisation model for optimum cut-off grade policy of open pit mining operations
by: Asad, M., et al.
Published: (2011)
by: Asad, M., et al.
Published: (2011)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
A Mixed Integer Programming Approach
for Transitioning from Open-pit to
Underground Mining
by: Chung, Joyce Sze Yee
Published: (2020)
by: Chung, Joyce Sze Yee
Published: (2020)
An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Transition from open-pit to underground – using Integer Programming considering grade uncertainty
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
by: Chung, Joyce Sze Yee, et al.
Published: (2015)
Optimisation of road position in open pit mining using location theory
by: parhizkar, A., et al.
Published: (2008)
by: parhizkar, A., et al.
Published: (2008)
New approach for estimating total mining costs in surface coal mines
by: Shafiee, S., et al.
Published: (2012)
by: Shafiee, S., et al.
Published: (2012)
Mining (Australia)
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
A new risk-based optimisation method for the iron ore production scheduling using stochastic integer programming
by: Mai, N., et al.
Published: (2018)
by: Mai, N., et al.
Published: (2018)
Simultaneous optimisation of stope boundaries and long term production scheduling for production shedules
by: Little, J., et al.
Published: (2011)
by: Little, J., et al.
Published: (2011)
Scenario evaluation through Mine Schedule Optimisation
by: Fava, L., et al.
Published: (2011)
by: Fava, L., et al.
Published: (2011)
Optimum design of open pit mines
by: Giannini, Luciano Mario
Published: (1990)
by: Giannini, Luciano Mario
Published: (1990)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
Mine waste rock management
by: Topal, Erkan, et al.
Published: (2012)
by: Topal, Erkan, et al.
Published: (2012)
Managing mine road maintenance interventions using mine truck on-board data
by: Marais, W., et al.
Published: (2008)
by: Marais, W., et al.
Published: (2008)
The Thin Coal Seam (TCS) Mining Technology for Open Pit Mines in China
by: Liu, P., et al.
Published: (2018)
by: Liu, P., et al.
Published: (2018)
Where to Make the Transition from Open-pit to Underground?: Using Integer Programming
by: Chung, J., et al.
Published: (2016)
by: Chung, J., et al.
Published: (2016)
Similar Items
-
Optimising the long term mine landform progression and truck hour schedule in a large scale open pit mine using mixed integer programming
by: Li, Y., et al.
Published: (2018) -
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
by: Li, Y., et al.
Published: (2016) -
Mining truck scheduling with stochastic maintenance cost
by: Topal, Erkan, et al.
Published: (2012) -
Using Clustering Methods for Open Pit Mine Production Scheduling
by: Ren, H., et al.
Published: (2014) -
Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints
by: Lin, Wei
Published: (2021)