Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practise mainly focuses on the ore...
| Main Authors: | , , |
|---|---|
| Other Authors: | |
| Format: | Conference Paper |
| Published: |
The Australasian Institute of Mining and Metallurgy
2014
|
| Online Access: | http://hdl.handle.net/20.500.11937/41626 |