Li, Y., Topal, E., Ramazan, S., & Dimitrakopoulos, R. (2014). Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming. The Australasian Institute of Mining and Metallurgy.
Chicago Style (17th ed.) CitationLi, Y., Erkan Topal, S. Ramazan, and R. Dimitrakopoulos. Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming. The Australasian Institute of Mining and Metallurgy, 2014.
MLA (9th ed.) CitationLi, Y., et al. Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming. The Australasian Institute of Mining and Metallurgy, 2014.